GFJ CONST SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 45 linked DPWH project(s) totaling about ₱472,527,018.49. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
GFJ CONST SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 45
- Total value
- ₱472,527,018.49
- Published flags
- 0
- Region
- Cotabato 1st DEO · Region XII
Online presence
Google Maps: GfJ Construction Supply and MerchandiseGoogle Maps, 2026-10-22
5HR5+PJQ, Midsayap, Cotabato
Public Record Grade
A transparent, data-derived summary of reported public records for GFJ CONST SUPPLY — not an accusation or finding of wrongdoing.
Score: 82.60 / 100 · Projects in sample: 45 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 72.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 72.4
- lateCompletedProjects
- 11
- onTimeCompletedProjects
- 30
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 45
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 45
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 45
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 45
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 45
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
44 geotagged projects — Open full map · Download projects (CSV)
- PATIL-BAUGAN-BADAK- JUNCTION CAMPO 10 (RANGAYEN) ROAD IN SUPPORT OF BANANA INDUSTRY, COFFEE PRODUCTION AND PROCESSING, CORN PRODUCTION AND MARKETING AND RICE GRANARY, ALAMADA, NORTH COTABATO25MD0037 · ₱38,008,274.71 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF BULONG ROAD, LIBUNGAN, NORTH COTABATO22MD0033 · ₱29,106,000.02 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG ALEOSAN BARANGAY ROAD FROM KATALICANAN-CAWILIHAN CONNECTING TO LAWILI IN SUPPORT OF RUBBER AND PALM OIL INDUSTRIES, ALEOSAN, COTABATO19MD0029 · ₱22,342,779.84 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1642 + 546- K1642 + 628, PRESIDENT ROXAS, COTABATO24MC0014 · ₱20,819,524.85 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG ALEOSAN BARANGAY ROAD FROM KATALICANAN-CAWILIHAN CONNECTING TO LAWILI IN SUPPORT OF RUBBER AND PALM OIL INDUSTRIES, ALEOSAN, COTABATO20MD0021 · ₱19,600,000.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROAD - ALONG DUALING-NEW PANAY-MIDSAYAP RD, MIDSAYAP, NORTH COTABATO25MD0048 · ₱18,953,187.22 · mapped
- CONCRETING OF BRGY. SOUTH MANUANGAN - BRGY. NEW CULASI FMR, BRGY. SOUTH MANUANGAN AND BRGY. NEW CULASI, PIGCAWAYAN, NORTH COTABATO19MD0105 · ₱18,904,779.76 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROAD ALONG BANISILAN-GUILING-ALAMADA-LIBUNGAN ROAD, ALAMADA, NORTH COTABATO25MD0047 · ₱17,630,168.66 · mapped
- ROAD WIDENING ALONG BANISILAN-GUILING-ALAMADA-LIBUNGAN ROAD, ALAMADA, COTABATO21MD0065 · ₱16,170,322.90 · mapped
- CONSTRUCTION OF LIBUNGAN RIVER FLOOD CONTROL PROJECT (ABAGA SECTION-PHASE V), ABAGA, LIBUNGAN, COTABATO20MD0008 · ₱15,110,077.76 · mapped
- CONCRETING OF KATALICANAN, ALEOSAN-BITOKA-MILAYA ROAD, MIDSAYAP, COTABATO21MD0071 · ₱14,701,500.35 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF MEDAL ROAD, BARANGAY PALAO, LIBUNGAN, NORTH COTABATO22MD0053 · ₱14,552,999.99 · mapped
- CONCRETING OF BRGY. POBLACION TO BRGY. BULACAON FMR, BRGY. POBLACION AND BRGY. BULACAON, PIGCAWAYAN, COTABATO25MD0067 · ₱14,477,249.93
- CONCRETING OF NALOGO-UPPER BAGUER-HACIENDA MARIA ROAD, UPPER BAGUER, PIGCAWAYAN, NORTH COTABATO20MD0104 · ₱14,111,942.14 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -SECONDARY ROAD - ALONG BANISILAN-GUILING-ALAMADA-LIBUNGAN ROAD, ALAMADA, NORTH COTABATO23MD0033 · ₱13,582,800.00 · mapped
- ALEOSAN BARANGAY ROAD FROM KATALICANAN - CAWILIHAN CONNECTING TO LAWILI IN SUPPORT OF RUBBER AND PALM OIL INDUSTRIES, ALEOSAN, COTABATO24MD0022 · ₱12,612,599.97 · mapped
- CONCRETING OF BRGY. MALU-AU TO BRGY. NEW CULASI FMR, BRGY. MALU-AU AND BRGY. NEW CULASI, PIGCAWAYAN, COTABATO24MD0066 · ₱9,850,499.97 · mapped
- CONCRETING OF SINAWINGAN-GUMAGA FMR, BRGY. SINAWINGAN AND BRGY. GUMAGA, LIBUNGAN, COTABATO24MD0064 · ₱9,850,499.95 · mapped
- CONCRETING OF BARANGAY MIDPAPAN I-MIDPAPAN II TO FAHLET QUARRY ROAD, PIGCAWAYAN, NORTH COTABATO21MD0036 · ₱9,800,999.51 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAD - ALONG DAVAO - COTABATO ROAD (JCT. DIGOS - COTABATO SECT.), ALEOSAN, NORTH COTABATO23MD0055 · ₱9,779,552.29 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG ALEOSAN BARANGAY ROAD FROM KATALICANAN-CAWILIHAN CONNECTING TO LAWILI IN SUPPORT OF RUBBER AND PALM OIL INDUSTRIES, ALEOSAN, COTABATO21MD0047 · ₱9,701,999.35 · mapped
- CONCRETING OF BRGY. RANGAYEN- SITIO LUBOG FMR PHASE IV, ALAMADA, NORTH COTABATO19MD0086 · ₱9,700,486.89 · mapped
- CONSTRUCTION OF CONCRETE ROAD - ALEOSAN BARANGAY ROAD FROM KATALICANAN - CAWILIHAN CONNECTING TO LAWILI IN SUPPORT OF RUBBER AND PALM OIL INDUSTRIES, ALEOSAN, COTABATO23MD0019 · ₱9,506,225.47 · mapped
- CONSTRUCTION OF CONCRETE ROAD - JCT. SAN MATEO TO UPPER MINGADING LEADING TO UK PEAK, BRGY. SAN MATEO, ALEOSAN, NORTH COTABATO23MD0017 · ₱9,506,067.88 · mapped
- CONSTRUCTION OF LATERAL B SERVICE ROAD ALONG CENTRAL KATINGAWAN-SAN ISIDRO ROAD, PACKAGE II, MIDSAYAP, COTABATO25MD0027 · ₱9,315,872.31 · mapped
- CONSTRUCTION OF LATERAL B SERVICE ROAD ALONG CENTRAL KATINGAWAN - SAN ISIDRO ROAD, PACKAGE I, MIDSAYAP, COTABATO25MD0026 · ₱9,315,848.98 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG ALEOSAN BARANGAY ROAD FROM KATALICANAN-CAWILIHAN CONNECTING TO LAWILI IN SUPPORT OF RUBBER AND PALM OIL INDUSTRIES, ALEOSAN, COTABATO22MD0002 · ₱7,276,499.05 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF JUNCTION NATIONAL HIGHWAY - ABAGA ROAD, LIBUNGAN, COTABATO24MD0015 · ₱5,880,599.97 · mapped
- CONSTRUCTION OF LOWER KATINGAWAN - POBLACION 7 - BUAL SUR PROVINCIAL ROAD - PHILRICE, MIDSAYAP, COTABATO24MD0007 · ₱4,937,828.51 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF NEW CULASI-MOLOK-NEW PANAY ROAD, PIGCAWAYAN, NORTH COTABATO22MD0008 · ₱4,900,500.41 · mapped
- CONSTRUCTION OF ROAD, LOWER KATINGAWAN-POBLACION 7-PROVINCIAL ROAD-PHILRICE, MIDSAYAP, NORTH COTABATO23MD0048 · ₱4,900,500.00 · mapped
- CONSTRUCTION OF ROAD OF PUROK UPHORBIA-SITIO DUNGGUAN, BARANGAY BULUCAON, PIGKAWAYAN, NORTH COTABATO23MD0054 · ₱4,900,500.00 · mapped
- CONCRETING OF NEW CULASI ROAD, PIGCAWAYAN, COTABATO24MD0044 · ₱4,900,499.97 · mapped
- CONSTRUCTION OF POBLACION 3 - ROAD, POBLACION 3, PIGCAWAYAN, COTABATO24MD0006 · ₱4,900,499.95 · mapped
- CONCRETING OF BARANGAY MALU-AO - BARANGAY NEW PANAY ROAD PIGCAWAYAN, COTABATO23MD0103 · ₱4,823,999.97 · mapped
- CONCRETING OF RANGAYEN-SITIO LUBOG FMR, BARANGAY RANGAYEN, ALAMADA, NORTH COTABATO18MD0150 · ₱4,726,072.02 · mapped
- OPENING AND CONCRETING OF BARANGAY MIDPAPAN II-BARANGAY RENIBON FMR PHASE I, BARANGAY MIDPAPAN II AND BARANGAY RENIBON, PIGCAWAYAN, NORTH COTABATO18MD0149 · ₱4,725,681.45 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF NORTH MANUANGAN-MALUAO ROAD, PIGCAWAYAN, NORTH COTABATO22MD0011 · ₱4,700,499.84 · mapped
- CONCRETING OF BAO-KISULAO ROAD, BAO-KISULAO, ALAMADA, NORTH COTABATO18MD0021 · ₱2,329,122.81 · mapped
- CONCRETING OF ND AVENUE TO LUCENA ST., QUIRINO EXTENSION, BARANGAY POBLACION 3, PIGCAWAYAN, NORTH COTABATO21MD0012 · ₱1,960,197.68 · mapped
- CONCRETING OF CENTRAL PANATAN ROAD, PUROK 2-PUROK 7, BARANGAY CENTRAL PANATAN, PIGCAWAYAN, NORTH COTABATO21MD0013 · ₱1,960,196.56 · mapped
- REHABILITATION / MAJOR REPAIR OF BRIDGE - GREBONA BR. (B01246MN) ALONG BANISILAN-GUILING-ALAMADA-LIBUNGAN RD., LIBUNGAN, NORTH COTABATO22MD0039 · ₱1,930,600.02 · mapped
- CONCRETING OF VIN LUAN STREET, POBLACION 1, PIGCAWAYAN, COTABATO20MD0048 · ₱1,920,496.97 · mapped
- CONCRETING OF LOCAL ROAD, FROM MIDPAPAN 2 TO BOUNDARY OF MIDPAPAN 1, PIGCAWAYAN, COTABATO20MD0066 · ₱1,920,400.51 · mapped
- CONCRETING OF ND AVENUE TO LUCENA STREET/QUIRINO EXTENSION, POBLACION 3, PIGCAWAYAN, COTABATO20MD0086 · ₱1,920,062.10 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →