AL GHAMDY BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 13 linked DPWH project(s) totaling about ₱154,922,119.63. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
AL GHAMDY BUILDERS
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 13
- Total value
- ₱154,922,119.63
- Published flags
- 0
- Region
- Region X · Region X
Licensed officers (PCAB)
- SARAH ASNAREZAH LOMONDOT ALIKHAN · Authorized Managing Officer (PCAB license 46020) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for AL GHAMDY BUILDERS — not an accusation or finding of wrongdoing.
Score: 75.70 / 100 · Projects in sample: 13 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 77.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 77.8
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 7
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 8
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 76.9/100 · Weight: 24%
- totalProjects
- 13
- componentScore
- 76.9
- terminatedProjects
- 1
- terminationRatePct
- 7.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 12
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 13
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 13
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
13 geotagged projects — Open full map · Download projects (CSV)
- REPLACEMENT OF PERMANENT WEAK BRIDGES ILIAN BR. (B02104MN) ALONG COTABATO-MALABANG-LANAO DEL NORTE RD24K00278 · ₱28,659,991.23 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES ILIAN BR. (B02104MN) ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTERD) (PHASE II)25K00002 · ₱28,656,854.30 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MANTAPOLI, MARANTAO, LANAO DEL SUR24K00485 · ₱19,595,766.50 · mapped
- CONSTRUCTION OF ROAD, BARANGAY DUMOY, DAVAO CITY22LB0332 · ₱17,953,271.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAGOLOAN, LANAO DEL SUR24K00532 · ₱14,700,846.27 · mapped
- CONSTRUCTION OF CONCRETE ROAD - PONCIANO ST. - BANGOY ST. -JACINTO EXTENSION ST. LEADING TO MARCO POLO HOTEL ALDEVINCO SHOPPING CENTER - MADRAZO FRUIT STANDS - CENTRAL BANK-F.TORRES ST., BRGY. 34-D, DAVAO CITY. PACKAGE II21LB0019 · ₱13,427,960.00 · mapped
- CONSTRUCTION/REHABILITATION OF DRAINAGE ALONG PAG-ASA ST. - SUAZO ST. - JCT. QUEZON BOULEVARD MAIN DRAIN, DAVAO CITY20LB0156 · ₱9,408,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAGONSONGAN, MARAWI CITY, LANAO DEL SUR21K00333 · ₱5,791,360.96 · mapped
- CONSTRUCTION OF ROAD, BARANGAY MA-A, DAVAO CITY22LB0041 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF ROAD, BARANGAY 33-D, DAVAO CITY22LB0037 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF BARANGAY WAGO ROAD, LUMBAYANAGUE, LANAO DEL SUR25K00078 · ₱4,900,250.56 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ILIAN, BAYANG, LANAO DEL SUR21K00224 · ₱1,927,818.81 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY 15-B, DAVAO CITY22LB0270 · ₱0.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 46020
- Category
- D · Small B
- Minimum net worth for this category
- ₱2,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Apr 11, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 46020); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 18 awards · ₱214,059,812.74
- Environmental Management Bureau, Denr-Region X Infrastructure: 1 award · ₱748,852.84
- 25K00002
- 25K00078
- 24K00532
- 24K00485
- 24-RIL2RD692 (Civil Work)₱27,344,979.00· 2024-08-14· Other construction· MINISTRY OF PUBLIC WORKS - BARMM LANAO DEL SUR 2ND DEO
- 24K00278
- 22IP026₱10,404,318.09· 2022-08-02· Other construction· MINISTRY OF PUBLIC WORKS - BARMM LANAO DEL SUR FIRST ENG'G D
- 22LB0037₱4,765,673.59· 2022-03-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO CITY DEO
- 22LB0332₱16,325,932.87· 2022-03-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO CITY DEO
- 22LB0041₱4,808,461.26· 2022-03-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO CITY DEO
- 22LB0270₱4,851,079.03· 2022-03-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO CITY DEO
- 20SDF009₱9,431,911.41· 2022-01-25· Other construction· MINISTRY OF PUBLIC WORKS - BARMM LANAO DEL SUR FIRST ENG'G D
- Construction of Slab Concrete of the Two (2) Overh
- 21K00333
- 21K00224
- 21LB0019₱13,156,671.97· 2021-04-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO CITY DEO
- 20IP0011₱4,642,961.39· 2021-03-30· Other construction· MINISTRY OF PUBLIC WORKS - BARMM LANAO DEL SUR FIRST ENG'G D
- 20LB0156₱9,276,513.38· 2020-11-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO CITY DEO
- 19K00460
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →