GREYSTONE CONST is listed as a company organization in Philippine public procurement records on this site, with 11 linked DPWH project(s) totaling about ₱68,491,428.99. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
GREYSTONE CONST
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 11
- Total value
- ₱68,491,428.99
- Published flags
- 0
- Region
- Bohol 1st DEO · Region VII
Licensed officers (PCAB)
- Peter N Torrefranca · Authorized Managing Officer (PCAB license 54049) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for GREYSTONE CONST — not an accusation or finding of wrongdoing.
Score: 73.90 / 100 · Projects in sample: 11 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 60/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 60
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 6
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 8
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 11
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 11
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
11 geotagged projects — Open full map
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BOYOG SUR, BALILIHAN, BOHOL25HA0111 · ₱9,674,968.57 · mapped
- REHABILITATION (COMPLETION) OF DPWH BOHOL 2ND DEO BUILDING, UBAY, BOHOL24HC0164 · ₱8,815,000.00 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN BAGONGBANWA HIGH SCHOOL, BARANGAY BAGONGBANWA, TUBIGON, BOHOL24HA0103 · ₱7,954,812.16 · mapped
- BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF 3-CLASSROOM SCHOOL BUILDING CUAMING HIGH SCHOOL (SECONDARY) IN BARANGAY CUAMING, INABANGA, BOHOL24HC0115 · ₱7,452,500.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDINGS (POBLACION I, LIBJO), SIKATUNA, BOHOL25HA0061 · ₱6,925,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAL-ING, BALILIHAN, BOHOL24HA0098 · ₱6,924,976.42 · mapped
- CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (PHASE 2), POBLACION, SIKATUNA, BOHOL25HA0093 · ₱6,918,743.67 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN BUENOS AIRES ELEMENTARY SCHOOL, BARANGAY BUENOS AIRES, TUBIGON, BOHOL24HA0106 · ₱4,970,713.87 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (SIKATUNA NATIONAL HIGH SCHOOL), SIKATUNA, BOHOL24HA0036 · ₱4,944,714.30 · mapped
- REHABILITATION OF MATERIALS QUALITY OFFICE AND LABORATORY BUILDING, DPWH BOHOL 2ND DEO, UBAY, BOHOL24HC0155 · ₱1,955,000.00 · mapped
- REHABILITATION (COMPLETION) OF DPWH STAFF HOUSE, DPWH BOHOL 2ND DEO, BARANGAY BOOD, UBAY, BOHOL24HC0133 · ₱1,955,000.00 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
