JJR ACE CONST AND SUPPLY CORP is listed as a company organization in Philippine public procurement records on this site, with 14 linked DPWH project(s) totaling about ₱78,648,751.94. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
JJR ACE CONST AND SUPPLY CORP
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 14
- Total value
- ₱78,648,751.94
- Published flags
- 0
- Region
- Davao del Norte DEO · Region XI
Online presence
Google Maps: JJR ACE Construction and Supply Corporation★ 3.7 (3 reviews)Google Maps, 2026-10-22
HP89+666, Kapalong, Davao del Norte
Licensed officers (PCAB)
- Mary Grace Bartolome Rabino · Authorized Managing Officer (PCAB license 44145) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JJR ACE CONST AND SUPPLY CORP — not an accusation or finding of wrongdoing.
Score: 87.50 / 100 · Projects in sample: 14 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 14
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 14
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 14
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 14
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 14
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 14
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
14 geotagged project(s) — Open full map
- CONSTRUCTION OF 2 STOREY 4 CLASSROOM, SALVACION ELEMENTARY SCHOOL, PANABO CITY, DAVAO DEL NORTE (9.5M X 32.00M)20LC0138 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF ISOLATION FACILITY AT DAVAO DEL NORTE HOSPITAL - CARMEN ZONE, DAVAO DEL NORTE22LC0196 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD FROM BRGY. MANGALCAL TO BRGY. CEBULANO, CARMEN, DAVAO DEL NORTE21LC0215 · ₱9,779,467.35 · mapped
- CONSTRUCTION OF PERIMETER FENCE, 60TH INFANTRY (MEDIATOR) BATTALION, DOÑA ANDREA, ASUNCION, DAVAO DEL NORTE20LC0105 · ₱6,756,780.73 · mapped
- CONSTRUCTION OF 2-STOREY MULTI-PURPOSE BUILDING (DSWD BUILDING), SAN ISIDRO, DAVAO DEL NORTE23LC0053 · ₱4,949,294.56 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM OF BARANGAY SAN IGNACIO, MANAY, DAVAO ORIENTAL21LF0118 · ₱4,942,310.93 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM (LEVEL II), BARANGAY MONTE DUJALI, SAN ISIDRO, DAVAO DEL NORTE22LC0128 · ₱4,900,551.07 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRIBAL HALL), GUPITAN, KAPALONG, DAVAO DEL NORTE21LC0147 · ₱2,969,984.04 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LINAO, SAN ISIDRO, DAVAO DEL NORTE21LC0155 · ₱2,959,063.15 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL TRIBAL HALL), CAMBANOGOY, ASUNCION, DAVAO DEL NORTE21LC0145 · ₱2,959,056.46 · mapped
- CONSTRUCTION OF COMMANDING OFFICER BUILDING, 60TH INFANTRY (MEDIATOR) BATTALION, DOÑA ANDREA, ASUNCION, DAVAO DEL NORTE20LC0102 · ₱2,537,282.27 · mapped
- COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY GYM) AT PUROK 1, BRGY. CAMANSA, ASUNCION, DAVAO DEL NORTE21LC0181 · ₱2,445,017.66 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. SOUTHERN DAVAO, PANABO CITY, DAVAO DEL NORTE20LC0074 · ₱1,980,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER), BARANGAY SAN NICOLAS, PANABO CITY, DAVAO DEL NORTE21LC0110 · ₱1,969,943.72 · mapped
