ERIANE CONST is listed as a company organization in Philippine public procurement records on this site, with 24 linked DPWH project(s) totaling about ₱135,282,363.65. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ERIANE CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 24
- Total value
- ₱135,282,363.65
- Published flags
- 0
- Region
- Bukidnon 1st DEO · Region X
Public Record Grade
A transparent, data-derived summary of reported public records for ERIANE CONST — not an accusation or finding of wrongdoing.
Score: 85.90 / 100 · Projects in sample: 24 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 86/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 86
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 20
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 24
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 24
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 24
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 24
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 24
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
24 geotagged projects — Open full map · Download projects (CSV)
- REHABILITATION OF HALAPITAN-SITIO NALA, HALAPITAN, SAN FERNANDO, BUKIDNON, HALAPITAN, SAN FERNANDO, BUKIDNON 2ND LD23KA0161 · ₱19,900,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NEW EDEN, PANGANTUCAN, BUKIDNON25KN0007 · ₱12,847,998.47 · mapped
- CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING,IBA INTEGRATED SCHOOL, CABANGLASAN, BUKIDNON (SCHOOL ID: 500890)BRGY. IBA, CABANGLASAN, BUKIDNON 2ND LD20KA0093 · ₱11,001,983.80 · mapped
- CONCRETING OF BRGY SAMPAGUITA TO BRGY PINAMULA FMR, BARANGAY SAMPAGUITA AND BRGY PINAMULA, KIBAWE, BUKIDNON21KB0073 · ₱9,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. NINOY AQUINO, KALILANGAN, BUKIDNON23KC0100 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM BRGY. KIPADUCAN TO BRGY. MALIPAYON, PANGANTUCAN, BUKIDNON21KC0040 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF BOX CULVERT, BARANGAY HALAPITAN, MUNICIPALITY OF SAN FERNANDO, SITIO NALA, BRGY. HALAPITAN, SAN FERNANDO, BUKIDNON23KA0186 · ₱9,650,000.00 · mapped
- REHABILITATION/RECONSTRUCTION OF KAPALONG -TALAINGOD - VALENCIA(BUKIDNON) ROAD WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE,K1538+840-K1538+884,SAN FERNANDO, BUKIDNONSAN FERNANDO, BUKIDNON21KA0101 · ₱6,855,726.01 · mapped
- CONSTRUCTION OF 1 UNIT, 1 STY - 4 CL SCHOOL BUILDING, CAMP I ES, CAMP I, MARAMAG, BUKIDNON17KB0104 · ₱5,123,013.38 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT SH-IMPALAMBONG-OLD CASISANG RD - K1507 + (-1311) - K1507 + (-1054), MALAYBALAY CITY, BUKIDNON BRGY. IMPALAMBONG, MALAYBALAY CITY, BUKIDNON 2ND LD22KA0056 · ₱5,119,120.00 · mapped
- CONSTRUCTION OF ROAD, BARANGAY SACRAMENTO VALLET, SAN FERNANDO, BUKIDNON, BARANGAY SACRAMENTO VALLEY, SAN FERNANDO, BUKIDNON 2ND LD24KA0119 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAPULO, MALAYBALAY CITY, BUKIDNON BRGY. MAPULO, MALAYBALAY CITY, BUKIDNON 2ND LD21KA0039 · ₱3,958,321.43 · mapped
- CONSTRUCTION OF 1 UNIT, 1 STY - 2 CL SCHOOL BUILDING, SAGBAYAN ES, SAGBAYAN, DANGCAGAN, BUKIDNON17KB0082 · ₱3,022,888.49 · mapped
- CONSTRUCTION OF 1 UNIT, 1 STY - 2 CL SCHOOL BUILDING, DOLOROSA ES, DOLOROSA, DANGCAGAN, BUKIDNON17KB0081 · ₱3,021,696.55 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OFMULTI-PURPOSE BUILDING, BARANGAY KIBANGAY, MUNICIPALITY OF LANTAPAN, BUKIDNONLANTAPAN, BUKIDNON19KA0102 · ₱2,422,519.86 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OFMULTI-PURPOSE BUILDING, BARANGAY KALABUGAW, MUNICIPALITY OF IMPASUG-ONG, BUKIDNONIMPASUG-ONG, BUKIDNON19KA0099 · ₱2,382,437.66 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OFMULTI-PURPOSE BUILDING, BARANGAY BASAK, MUNICIPALITY OF LANTAPAN, BUKIDNONLANTAPAN, BUKIDNON19KA0096 · ₱2,380,447.10 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. ADTUYON, PANGANTUCAN, BUKIDNON20KC0041 · ₱2,112,113.26 · mapped
- COMPLETION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY MAGSAYSAY, QUEZON, BUKIDNON19KB0147 · ₱1,980,000.00 · mapped
- REHABILITATION OF WATER SUPPLY SYSTEMS - REHABILITATION OF WATER SUPPLY - LEVEL II, BRGY. ST. PETER, MALAYBALAY CITY BUKIDNONMALAYBALAY CITY BUKIDNON20KA0077 · ₱1,979,923.94 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY KIORAO, KIBAWE, BUKIDNON20KB0045 · ₱1,974,423.70 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (HALL OF PEACE), BRGY. FREEDOM, CABANGLASAN, BUKIDNON20KA0078 · ₱1,973,188.42 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY MAUSWAGON, DON CARLOS, BUKIDNON20KB0019 · ₱1,881,002.58 · mapped
- 20KA0043CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (STAGE), BRGY. SAN MARTIN, MALAYBALAY CITY, BUKIDNONMALAYBALAY CITY, BUKIDNON20KA0043 · ₱995,559.00 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →