SJ MILLENNIUM CONST AND CONST SUPPLY CORP is listed as a company organization in Philippine public procurement records on this site, with 30 linked DPWH project(s) totaling about ₱616,478,912.26. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
SJ MILLENNIUM CONST AND CONST SUPPLY CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 30
- Total value
- ₱616,478,912.26
- Published flags
- 2
- Region
- Ilocos Sur 1st DEO · Region I
Licensed officers (PCAB)
- Coleen Caridad P. Yuksel · Authorized Managing Officer (PCAB license 47890) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for SJ MILLENNIUM CONST AND CONST SUPPLY CORP — not an accusation or finding of wrongdoing.
Score: 80.30 / 100 · Projects in sample: 30 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 66.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 66.2
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 21
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 29
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 30
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 30
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99/100 · Weight: 11%
- projects
- 30
- componentScore
- 99
- flagsPerProject
- 0.03
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 30
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
29 geotagged projects — Open full map · Download projects (CSV)
- INSTALLATION OF ROAD SAFETY DEVICES (STREET LIGHTS) ALONG MNR PHASE II, BANTAY, ILOCOS SUR22AC0032 · ₱63,690,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BANTAY, ILOCOS SUR25AC0033 · ₱47,500,811.82 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANTAOAY RIVER, BARANGAY LINGSAT, BANTAY, ILOCOS SUR25AC0031 · ₱47,398,288.63 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TALEB, BANTAY, ILOCOS SUR25AC0056 · ₱46,667,930.21 · mapped
- CONSTRUCTION OF LINGSAT BRIDGE, BARANGAY LINGSAT, BANTAY, ILOCOS SUR23AC0071 · ₱44,100,000.00 · mapped
- IMPROVEMENT OF ROAD WITH CANAL, BALALENG, ZONE III, ZONE IV AND ZONE VI, BANTAY, ILOCOS SUR21AC0163 · ₱32,273,992.40 · mapped
- CONCRETING OF BRGY. PAING FMR, BRGY. PAING, BANTAY, ILOCOS SUR22AC0070 · ₱29,850,000.00 · mapped
- Construction of Flood Control, San Mariano, Bantay, Ilocos Sur22AC0010 · ₱29,400,000.00 · mapped
- Construction of Flood Control Structure along Bantaoay River, Barangay Dongalo, San Ildefonso, Ilocos Sur23AC0057 · ₱24,500,000.00 · mapped
- Construction of Flood Control Structure, Barangay Lingsat, Bantay, Ilocos Sur22AC0009 · ₱24,500,000.00 · mapped
- Construction of Flood Control Structure along Cabaroan Creek, Barangay Cabaroan, Bantay, Ilocos Sur22AC0008 · ₱24,500,000.00 · mapped
- Construction of Flood Control Structure along Bantaoay River, Barangay Lingsat, Bantay, Ilocos Sur23AC0056 · ₱24,500,000.00 · mapped
- CONSTRUCTION OF BRIDGE, BARANGAY SAN JULIAN, BANTAY, ILOCOS SUR23AC0072 · ₱24,500,000.00 · mapped
- REPLACEMENT OF BRIDGE, BARANGAY CABANGLOTAN, SAN JUAN, ILOCOS SUR24AC0041 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN PANTAY TAMURONG ELEMENTARY SCHOOL, BARANGAY PANTAY TAMURONG, CAOAYAN, ILOCOS SUR24AC0097 · ₱15,553,343.21 · mapped
- CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN VILLAMAR ELEMENTARY SCHOOL, BARANGAY VILLAMAR, CAOAYAN, ILOCOS SUR24AC0098 · ₱15,553,343.21 · mapped
- CONSTRUCTION OF SAN ISIDRO BRIDGE, BANTAY, ILOCOS SUR22AC0024 · ₱10,780,000.00 · mapped
- CONSTRUCTION OF SCHOOL BUILDING, TAY-AC ELEMENTARY SCHOOL, BANTAY, ILOCOS SUR24AC0055 · ₱9,880,898.92 · mapped
- CONSTRUCTION OF BRGY. BRIDGE, LINGSAT, BANTAY, ILOCOS SUR22AC0001 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF BRIDGE, BARANGAY SINABAAN, BANTAY, ILOCOS SUR23AC0073 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF ROAD, SITIO PAISTE, TAY-AC, BANTAY, ILOCOS SUR22AC0023 · ₱9,800,000.00 · mapped
- CONSTRUCTION / COMPLETION OF MULTI-PURPOSE BUILDING, BANTAY, ILOCOS SUR25AC0051 · ₱8,645,045.33
- CONSTRUCTION OF MALINGEB BRIDGE 2, BANTAY, ILOCOS SUR22AC0004 · ₱8,330,000.00 · mapped
- CONSTRUCTION OF ROAD, BARANGAY MALINGEB, BANTAY, ILOCOS SUR22AC0025 · ₱5,445,000.00 · mapped
- CONSTRUCTION OF PAING BRIDGE 3, BANTAY, ILOCOS SUR22AC0005 · ₱5,390,000.00 · mapped
- CONSTRUCTION OF ROAD, BARANGAY PAING, BANTAY, ILOCOS SUR22AC0026 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF ROAD, BRGY. TAGUIPORO, BANTAY, ILOCOS SUR24AC0073 · ₱4,919,994.58 · mapped
- CONSTRUCTION OF BRIDGE, BARANGAY LINGSAT, BANTAY, ILOCOS SUR23AC0002 · ₱4,900,443.97 · mapped
- CONSTRUCTION OF ROAD, BARANGAY SAN JULIAN, BANTAY, ILOCOS SUR23AC0088 · ₱4,899,684.25 · mapped
- CONSTRUCTION OF ROAD, BARANGAY BOQUIG, BANTAY, ILOCOS SUR23AC0099 · ₱4,850,135.73 · mapped
Equipment & capacity
PCAB license
- License no.
- 47890
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Feb 3, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 47890); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
4 evaluations listed across 3 GPPB CPES releases; average final rating 93.4% over 2 rated projects; 4 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 19, 2024 | DPWH (JV) | ₱39,200,000.00 | Completed | 95.7% | 96.4% | 37th, p. 34 |
| Nov 24, 2023 | DPWH (JV) | ₱24,500,000.00 | On-going | 93.5% | — | 37th, p. 98 |
| Oct 21, 2022 | DPWH (JV) | ₱49,000,000.00 | Completed | 92.5% | 90.5% | 35th, p. 52 |
| Jul 11, 2022 | DPWH (JV) | ₱49,000,000.00 | On-going | 89.1% | — | 34th, p. 26 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 34 awards · ₱738,970,537.31
- Province of Ilocos Sur Infrastructure: 22 awards · ₱64,545,909.74
- 25AC0033₱47,500,811.82· 2025-06-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 25AC0056₱46,667,930.21· 2025-03-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 25AC0031₱47,398,288.63· 2025-03-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 25AC0051₱8,645,045.33· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 24AC0097₱15,553,343.21· 2024-12-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 24AC0098₱15,553,343.21· 2024-12-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- Construction Projects
- 24AC0055₱9,880,898.92· 2024-06-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 24A00525
- 24AC0073₱4,919,994.58· 2024-05-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 24AC0041₱19,499,923.67· 2024-04-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- Construction Projects
- Construction Projects
- Construction Projects
- 23AC0099₱4,850,135.73· 2023-04-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 23AC0056₱24,253,041.93· 2023-04-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 23AC0002₱4,900,443.97· 2023-04-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 23AC0059₱38,804,970.97· 2023-04-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 23AC0058₱38,805,999.42· 2023-04-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 23AC0073₱9,701,538.02· 2023-04-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 23AC0088₱4,899,684.25· 2023-04-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 23AC0057₱24,254,923.19· 2023-04-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- 23AC0072₱24,252,875.99· 2023-04-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - ILOCOS SUR 1ST DEO
- Construction Projects
- Construction Projects
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →