ALMAKAR BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 168 linked DPWH project(s) totaling about ₱4,459,883,804.58. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
ALMAKAR BUILDERS
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 168
- Total value
- ₱4,459,883,804.58
- Published flags
- 0
- Region
- Cavite 3rd DEO · Region IV-A
Public Record Grade
A transparent, data-derived summary of reported public records for ALMAKAR BUILDERS — not an accusation or finding of wrongdoing.
Score: 79.90 / 100 · Projects in sample: 168 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 65.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 65.7
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 119
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 151
- pastTargetOngoingProjects
- 31
- undatedCompletedProjectsExcluded
- 16
- Termination rate
Component score: 94.6/100 · Weight: 24%
- totalProjects
- 168
- componentScore
- 94.6
- terminatedProjects
- 3
- terminationRatePct
- 1.8
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 168
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 168
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 168
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
46 geotagged project(s) — Open full map
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG AMUNTAY RIVER, FROM BRGY. ZONE TO BRGY. SAN JOSE, DASMARIÑAS CITY, CAVITE25DQ0044 · ₱140,479,800.53 · mapped
- CONSTRUCTION OF REVETMENT ALONG BACOOR RIVER, PHASE I, BARANGAY HABAY I AND BARANGAY PANAPAAN IV, BACOOR CITY, CAVITE24DQ0004 · ₱120,624,955.61 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PAGAMUTAN NG DASMARIÑAS EXTENSION BUILDING, BARANGAY BUROL II, DASMARIÑAS CITY, CAVITE25DQ0105 · ₱97,901,079.22 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERCONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RI21DF0019 · ₱96,500,000.00 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BACOOR-DASMARIÑAS NATIONAL RD - K0029 + 464 - K0030 + 77523DQ0075 · ₱96,499,931.17 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CARMONA RIVER (UPSTREAM) AT BARANGAY LANTIC, CARMONA, CAVITE24DQ0006 · ₱96,499,763.81 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG JULIAN RIVER, BRGY MALAGASANG 2-A (PHASE II) EAST SIDE,24DF0155 · ₱95,533,821.93 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF PAG-ASA - ALAPAN - TINABUNAN PACKAGE C,IMUS25DF0017 · ₱95,531,958.48 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - ACCESS RDS &/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF RD WITH DRAINAGE, BINAKAYAN INTERCH24DF0239 · ₱95,514,528.22 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERCONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BR21DF0032 · ₱86,905,970.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIESREHAB. OF PAG-ASA - ALAPAN - TINABUNAN RD.23DF0089 · ₱77,200,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (PARKING BUILDING) PHASE 1, BACOOR CITY, CAVITE AND CONSTRUCTION OF MULTI-PURPOSE BUI22DQ0048 · ₱72,674,905.88 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG ZAPOTE - LONGOS RIVER, ZAPOTE SECTION19DQ0069 · ₱60,461,855.50 · mapped
- LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF FULGENCIO DELA CUESTA STREET AT BRGY. PALIPARAN III, CITY OF DASMARIÑAS, CAVITE20DQ0083 · ₱56,934,861.46 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (AGIMAT GYM), BARANGAY MOLINO 3, BACOOR CITY, CAVITE25DQ0075 · ₱53,892,241.98 · mapped
- LOCALPROGRAMCONSTRUCTION/ REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDINGS AND OTHER STRUCTURES, SCHOOL BUILDING - CONSTRUCTION OF 4STY-20CL AT TANZA NTS ANNEX, TANZA, CAVITE20DF0121 · ₱50,662,500.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOODMITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENTALONG ILANG-ILANG RIVER, BRGY. TAPIA SECTION19DF0005 · ₱49,915,485.94 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BACOOR BLVD. - K0019 + 336 - K0020 + 18625DQ0010 · ₱49,235,675.65 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIV19DQ0022 · ₱48,749,950.89 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES ANDDRAINAGE SYSTEM - CONSTRUCTION OF REVETMENT ALONG BALUCTOT RIVERPHASE LL, WEST SIDE,18DQ0017 · ₱48,749,848.97 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF REVETMENT ALONG BALUCTOT RIVER, PHASE II, WESTSIDE18DQ0032 · ₱48,749,548.42 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIV19DQ0023 · ₱48,739,986.68 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - JUANITO R. REMULLA, SR. RD - K0036 + 914 - K0036 + 955, K0036 + 977 - K0037 + 95024DQ0047 · ₱48,506,878.91 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONST OF ROAD, YLANG YLANG RIVER DRIVE, N25DF0074 · ₱48,503,917.30 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE CANAL, BARANGAY NIOG, BACOOR CITY, CAVITE25DQ0025 · ₱48,042,511.50 · mapped
- CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT LANTIC ELEMENTARY SCHOOL, CARMONA, CAVITE18DQ0122 · ₱45,556,306.15 · mapped
- LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAMBOG I, BACOOR CITY, CAVITE; CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. HABAY II, BACOOR CITY, C20DQ0124 · ₱43,089,793.03 · mapped
- ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS TEJERO-GEN. TRIAS-AMADEO-TAGAYTAY ROAD, K0041+409 - K0042+746, K0042+855 - K0043+229.5020DF0118 · ₱42,158,620.00 · mapped
- MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGESYSTEMS, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BRGY. SALINAS 1, PHASE II, BACOOR, CAVITE; 2ND LEGISLATIVE DISTRICT17DQ0025 · ₱41,924,800.75
- LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/ FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY MABOLO 3, BACOOR CITY, CAVITE, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MOLINO 1, BACOOR19DQ0076 · ₱41,757,189.06 · mapped
- CONSTRUCTION OF 4STY 20CL SCHOOL BUILDING AT GOV. D. M. CAMERINO ES, IMUS17DF0168 · ₱41,470,017.69
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY HABAY 1, BACOOR CITY, CAVITE; CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MOLINO IV, BACOOR, CAVITE; CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PANAPAAN 3,24DQ0073 · ₱41,167,337.76 · mapped
- PROPOSED CONSTRUCTION OF (4) STOREY (20) CLASSROOM AT DASMARINAS EAST NATIONAL HIGH SCHOOL, DASMARINAS, CAVITE17DQ0102 · ₱40,152,410.75 · mapped
- CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM SCHOOLBUILDING AT BULIHAN NATIONAL HIGH SCHOOL, SILANG, CAVITE17DQ0130 · ₱40,053,636.66 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMCONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS -TERTIARY ROADSTEJERO-GEN. TRIAS-AMADEO-TAGAYTAY ROAD - K0037+510 - K0037+775, K22DF0038 · ₱39,795,840.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY ANIBAN 1, BACOOR CITY, CAVITE25DQ0037 · ₱39,223,613.21 · mapped
- ORGANIZATIONAL OUTCOM 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - TERTIARY ROADSTEJERO-GEN TRIAS-AMADEO-TAGAYTAY RD - K0043 + 304 - K0044 + 41221DF0138 · ₱39,215,680.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOODMANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES ANDDRAINAGE SYSTEMS-CONSTRUCTION OF REVETMENT ALONG ILANG ILANG RIVER, PHASE IV, BRGY. TAPIA20DF0080 · ₱39,200,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY. ALAPAN IIA SECTI19DF0014 · ₱39,199,989.63 · mapped
- MFO2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG ZAPOTE-LONGOS RIVER, ZAPOTE SECTION, PHASE II, BACOOR, CAVITE; 2ND LD17DQ0024 · ₱38,999,916.02
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIVER18DQ0014 · ₱38,996,794.42 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF DRAINAGE, BARANGAY HABAY 2, BACOOR CITY, CAVITE; REHABILITATION OF DRAINAGE, BARANGAY MOLINO 2, BACOOR CITY, CAVITE; REHABILI22DQ0028 · ₱37,464,662.37 · mapped
- MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG BACOOR RIVER, BANALO SECTION, PHASE III, BACOOR, CAVITE; 2ND LD17DQ0067 · ₱37,274,484.90
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS;FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BRGY. A18DF0025 · ₱37,208,630.21 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIESWITHIN MAJOR RIVER BASINS AND PRINCIPAL, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER,BRGY.18DF0015 · ₱37,196,855.29 · mapped
- CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOLBUILDING AT NIOG ELEMENTARY SCHOOL, BACOOR CITY, CAVITE17DQ0105 · ₱36,356,865.05 · mapped
- PROPOSED CONSTRUCTION OF (4) STOREY (12) CLASSROOM AT LIGAS I ELEMENTARY SCHOOL, BACOOR, CAVITE17DQ0098 · ₱36,355,701.79 · mapped
- LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MARCELINO MEMIJE, GEN. MARIANO ALVAREZ, CAVITE; CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SEVERINO20DQ0108 · ₱34,905,455.11 · mapped
- ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, ROAD WIDENING, PRIMARY ROADS - JUANITO R. REMULLA, SR. RD - K0038 + (-728) - K0038 + (-279), K0038 + (-159) - K0038 + 22220DF0079 · ₱33,497,460.15 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - ZAPOTE-ALABANG FLYOVER TO CAVITEX - (S01830LZ) CHAINAGE 000 - CHAINAGE 031, CHAINAGE 031 - CHAINAGE 57725DQ0008 · ₱33,286,186.12 · mapped
