RAPID FOREMOST CONST CO is listed as a company organization in Philippine public procurement records on this site, with 314 linked DPWH project(s) totaling about ₱9,490,794,548.60. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
RAPID FOREMOST CONST CO
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 314
- Total value
- ₱9,490,794,548.60
- Published flags
- 3
- Region
- Quezon 3rd DEO · Region IV-A
Licensed officers (PCAB)
- Jose E. Ang · Authorized Managing Officer (PCAB license 32618) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for RAPID FOREMOST CONST CO — not an accusation or finding of wrongdoing.
Score: 94.80 / 100 · Projects in sample: 314 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 91.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 91.1
- lateCompletedProjects
- 25
- onTimeCompletedProjects
- 279
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 312
- pastTargetOngoingProjects
- 8
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 99/100 · Weight: 21%
- totalProjects
- 314
- componentScore
- 99
- terminatedProjects
- 1
- terminationRatePct
- 0.3
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 314
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.7/100 · Weight: 11%
- projects
- 314
- componentScore
- 99.7
- flagsPerProject
- 0.01
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 314
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 235 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF GRAVEL ROAD AND CONCRETE ROAD - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 1, QUEZON PROVINCE18DM0083 · ₱165,497,618.66 · mapped
- ROAD UPGRADING (CONCRETE PAVING) ALONG SAN FRANCISCO-SAN ANDRES-SAN NARCISO ROAD, K0321+966-K0325+71616DM0008 · ₱144,749,990.09
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD K0266+025 - K0266+838, K0269+862-K0270+088 &17D00023 · ₱144,747,153.19 · mapped
- CONSTRUCTION OF GRAVEL ROAD - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 2, INCL. ROW, QUEZON PROVINCE18DM0082 · ₱118,205,582.86 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEA PORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN), QUEZON ECO-TOURISM-COTTA-DALAHICAN-TALAO-TALAO-MAYAO ROAD, LUCENA CITY, QUEZON21DJ0116 · ₱113,111,509.99 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM FLOOD CONTROL STRUCTURE, PACKAGE 4, LUCENA25DJ0087 · ₱105,086,948.06 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BRGY. SAMPALOC 2, SARIAYA, QUEZON PROVINCE23DJ0144 · ₱99,000,000.00 · mapped
- Construction of Seawall, Catanauan, Quezon22DM0110 · ₱96,500,000.00 · mapped
- CONSTRUCTION/COMPLETION OF COCONUT RESEARCH AND DEVELOPMENT CENTER, CATANAUAN, QUEZON19DM0056 · ₱96,500,000.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - ABUYON - BUENAVISTA RD - K0250+(-800) -K0253+089, K0253+153 - K0257+173, K0257+239 - K0257+852, ABUYON - BUENAVISTA SECTION18DM0005 · ₱96,500,000.00 · mapped
- NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SAN NARCISO ROAD (S04256LZ) K0256+172 - K0260+710, CATANAUAN, QUEZON19DM0087 · ₱96,500,000.00 · mapped
- OO2: PROTECTION LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (DOWNSTREAM-PACKAGE 1), SARIAYA, QUEZON22DJ0124 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD (PACKAGE 10), QUEZON23DJ0002 · ₱96,500,000.00 · mapped
- LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, ROAD WIDENING OF QUEZON ECO-TOURISM ROAD (S06104LZ), SECONDARY ROAD, K0167+960-K0169+056, K0169+160-K0169+500, K0169+780-K0170+320 LUCENA CIT20DJ0094 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF ROAD ALONG TAGBACAN SILANGAN - SAN JOSE ANYAO, CATANAUAN, QUEZON22DM0105 · ₱96,500,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 31), LUCENA CITY, QUEZON24DJ0112 · ₱96,500,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD ALONG TAGABAS IBABA - DOONGAN ILAYA, CATANAUAN, QUEZON22DM0134 · ₱96,500,000.00 · mapped
- NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 2, QUEZON, SAN FRANCISCO, QUEZON20DM0042 · ₱96,500,000.00 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - MSR JCT-LOPEZ-CATANAUAN RD- K0238 + 000 - K0241 + 000 CATANAUAN, QUEZON22DM0102 · ₱96,500,000.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - SN FRANCISCO-SN ANDRES- SN NARCISO RD - K0393+175 - K0401+804, SAN NARCISO SECTION18DM0010 · ₱96,500,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SUMILANG BRIDGE WITH APPROACHES, GENERAL LUNA, QUEZON22DM0141 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD, PACKAGE I, QUEZON, SAN ANTONIO, QUEZON20DJ0053 · ₱96,500,000.00 · mapped
- LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, ROAD WIDENING OF QUEZON ECO-TOURISM ROAD (S06104LZ), SECONDARY ROAD, K0157+808-K0159+882, K0160+142-K0160+569, SARIAYA, QUEZON20DJ0075 · ₱96,499,999.58 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ACCESS ROAD TO TRADING POST (QUE22DJ0020 · ₱96,499,999.47 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, QUEZON ECO-TOURISM-COTTA-DALAHICAN-TALAO-TALAO-MAYAO ROAD, LUCENA CITY, QUEZON20DJ0045 · ₱96,499,999.41 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS, MSR DIVERSION RD-K0133+020-K0134+017, LUCENA CITY, QUEZON20DJ0052 · ₱96,499,999.05 · mapped
- Construction of Dumacaa River Flood Control (Package 9), Lucena City, Quezon23DJ0072 · ₱96,499,987.48 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE18DC0092 · ₱96,491,153.54 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0257 + 300 - K0260 + 90025DM0135 · ₱93,601,831.75 · mapped
- CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCL. ROW SAN FRANCISCO-SAN NARCISO ROAD (SAN FRANCISCO-SAN ANDRES-SAN NARCISO ROAD), QUEZON 3RD LD (ROADS) SAN FRANCISCO, QUEZON16DM0013 · ₱91,483,555.87
- CONSTRUCTION/IMPROVEMENT OF TORRIJOS COMMERCIAL COMPLEX INCLUDING SITE DEVELOPMENT, TORRIJOS, MARINDUQUE22EA0191 · ₱89,098,023.12 · mapped
- NETWORK DEVELOPMANET: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - SN FRANCISCO - SN ANDRES - SN NARCISO RD - K0382+705 - K0387+843, SAN NARCISO, QUEZON20DM0010 · ₱87,246,615.00 · mapped
- LOCAL PROGRAM, CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES, CONSTRUCTION OF BRIDGE AND APPROACHES, BRGY. IBABANG DUPAY TO BRGY. 11, LUCENA CITY, QUEZON21DJ0111 · ₱86,850,000.00 · mapped
- IMPROVEMENT OF LAPU-LAPU - BUYABOD ROAD, STA. CRUZ, MARINDUQUE22EA0141 · ₱84,149,684.12 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 2), LUCENA CITY24DJ0016 · ₱79,130,000.00 · mapped
- ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - SECONDARY ROADS - MULANAY-SN FRANCISCO RD - K0278+000 - K0278+983, K0280+000 - K0281+447, K0289+000 - K0290+989, K0293+362 - K0293+793, MULANAY - SN FRANCISCO RD19DM0023 · ₱77,623,635.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS, QUEZON ECO-TOURISM SARIAYA - CANDELARIA - TIAONG - SAN ANTONIO ROAD, PACKAGE 3, QUEZON, SAN ANTONIO, QUEZON21DJ0063 · ₱77,200,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS, QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD (PACKAGE 4), QUEZON, CANDELARIA, QUEZON21DJ0056 · ₱77,200,000.00 · mapped
- Construction of Slope Protection along Quiapo River, Brgy. Pahinga Norte to Brgy. Poblacion, Candelaria, Quezon22DJ0001 · ₱77,199,999.90 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BRIDGE, QUEZON INDUSTRIAL22DJ0065 · ₱77,192,564.40 · mapped
- CONCRETING OF POBLACION-BANABA PROVINCIAL RD, SAN ANDRES, QUEZON19DM0039 · ₱76,415,455.00 · mapped
- ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0371+350-K0372+000, K0373+924-K0374+284, K0374+309-K0375+24219DM0001 · ₱75,443,700.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS, DAANG MAHARLIKA (LZ) K0099+081.6-K0100+000 TIAONG, QUEZON22DJ0015 · ₱72,606,599.42 · mapped
- NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAN FRANCISCO- SAN ANDRES- SAN NARCISO ROAD, PACKAGE 4, QUEZON SAN FRANCISCO, QUEZON21DM0046 · ₱72,375,000.00 · mapped
- NETWORK DEVELOPMENT CONSTRUCTION OF MISSING LINKS/ NEW ROADS- SAN FRANCISCO- SAN ANDRES-SAN NARCISO ROAD, PACKAGE 1, QUEZONSAN FRANCISCO, QUEZON21DM0064 · ₱72,375,000.00 · mapped
- NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0387+843 - K0388+413, K0388+481 - K0393+175, SAN NARCISO, QUEZON19DM0013 · ₱71,712,045.00 · mapped
- CONSTRUCTION OF LEGISLATIVE BUILDING INCLUDING IMPROVEMENT OF MUNICPAL HALL, TORRIJOS, MARINDUQUE22EA0190 · ₱69,298,006.04 · mapped
- Construction of Flood Control Structure along Catanauan River (Sta. 1+625 - Sta. 2+000) Catanauan, Quezon22DM0009 · ₱68,997,500.00 · mapped
- Construction of Flood Control Structure along Catanauan River (Sta. 3+250 - Sta. 3+625) Catanauan, Quezon22DM0053 · ₱68,997,500.00 · mapped
- CONSTRUCTION OF 4STY20CL, NIUGAN ES, CABUYAO CITY, LAGUNA24DI0157 · ₱68,187,856.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 32618
- Category
- AA · Large A
- Minimum net worth for this category
- ₱90,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱450M
- License valid until
- Mar 22, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 32618); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
20 evaluations listed across 7 GPPB CPES releases; average final rating 93.1% over 8 rated projects; 20 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 25, 2025 | DPWH | ₱79,130,000.00 | On-going | 94.5% | — | 40th, p. 253 |
| Feb 13, 2025 | DPWH | ₱79,130,000.00 | On-going | 95.6% | — | 39th (rev), p. 175 |
| Nov 29, 2024 | DPWH | ₱99,000,000.00 | Completed | 89.6% | 92.4% | 39th (rev), p. 175 |
| Nov 29, 2024 | DPWH | ₱96,500,000.00 | Completed | 93.4% | 94.4% | 39th (rev), p. 175 |
| May 22, 2024 | DPWH | ₱96,500,000.00 | On-going | 95.0% | — | 38th, p. 200 |
| May 22, 2024 | DPWH | ₱99,000,000.00 | On-going | 94.3% | — | 38th, p. 200 |
| Mar 15, 2024 | DPWH (JV) | ₱96,499,998.00 | On-going | 95.1% | — | 37th, p. 88 |
| Nov 17, 2023 | DPWH | ₱96,500,000.00 | Completed | 93.1% | 89.7% | 37th, p. 88 |
| Nov 17, 2023 | DPWH (JV) | ₱96,499,998.00 | On-going | 95.6% | — | 37th, p. 88 |
| May 12, 2023 | DPWH (JV) | ₱96,500,000.00 | On-going | 94.2% | — | 36th, p. 63 |
| May 11, 2023 | DPWH | ₱96,500,000.00 | On-going | 87.4% | — | 36th, p. 170 |
| Mar 2, 2023 | DPWH | ₱96,500,000.00 | Completed | 95.4% | 94.1% | 35th, p. 142 |
Showing the 12 most recent of 20.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 283 awards · ₱5,985,907,809.33
- Province of Quezon Infrastructure: 42 awards · ₱537,532,834.91
- Southern Luzon State University Goods & services: 6 awards · ₱159,280,700.25
- Marinduque State College Infrastructure: 2 awards · ₱112,883,925.59
- Municipality of Polillo, Quezon Infrastructure: 10 awards · ₱44,619,290.93
- NIA Goods & services: 5 awards · ₱30,702,911.33
- City of Tanauan Infrastructure: 8 awards · ₱29,778,737.89
- City of Calamba Infrastructure: 1 award · ₱26,990,798.69
- Province of Leyte Infrastructure: 1 award · ₱24,995,000.00
- Municipality of San Antonio, Quezon Infrastructure: 6 awards · ₱11,623,986.65
- Municipality of Lopez, Quezon Infrastructure: 4 awards · ₱9,575,295.52
- Municipality of Mulanay, Quezon Infrastructure: 1 award · ₱5,622,107.09
- Municipality of San Antonio, Quezon Goods & services: 3 awards · ₱2,665,872.50
- Municipality of Mulanay, Quezon Goods & services: 2 awards · ₱2,276,527.19
- Barangays and Sangguniang Kabataan Goods & services: 1 award · ₱1,300,000.00
- Barangays and Sangguniang Kabataan Infrastructure: 1 award · ₱842,000.00
- Municipality of Dolores, Quezon Infrastructure: 1 award · ₱697,000.00
- DPWH Goods & services: 1 award · ₱234,762.00
- 25DJ0146₱48,016,158.99· 2025-08-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0134₱4,321,307.32· 2025-07-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0135₱60,865,968.75· 2025-07-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DM0135 - Asset Preservation Program - Preventive₱93,601,831.75· 2025-05-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DJ0087₱105,086,948.06· 2025-05-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 24DI0157₱68,187,856.00· 2024-08-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LAGUNA II DEO
- 24DC0061 - Convergence and Special Support Program₱9,555,059.00· 2024-03-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATANGAS 3RD ED
- 24DC0026 - Convergence and Special Support Program₱4,777,430.00· 2024-03-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATANGAS 3RD ED
- 24DJ0016₱78,338,678.19· 2024-02-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 24EA0070₱39,186,390.21· 2024-02-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MARINDUQUE DEO
- 24DC0048 - Convergence and Special Support Program₱1,937,370.00· 2024-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATANGAS 3RD ED
- 24DC0049 - Convergence and Special Support Program₱1,940,190.00· 2024-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BATANGAS 3RD ED
- CONCRETING/CONSTRUCTION OF BARANGAY ROADS AND BRID
- CONCRETING/CONSTRUCTION OF BARANGAY ROADS AND BRID
- Concreting/Construction of Barangay Roads and Brid
- Const/Rehab/Imprvmt of Multi Purpose Halls/Buildin
- CONCRETING AND RDHABILITATION OF FARM-TO-MARKET RD
- REGRAVELLING OF BARANGAY ROADS
- Rehab/Improvement of Waste Management Facility
- CONST.OF ROAD NET.-SPILLWAY-BRGY.LANGUYIN
- CONST.OF MULTI-PURPOSE HALL-BRGY.LIBJO
- IMP./CONST.OF POBLACION MUN.ROAD NETWORKS
- IMP.OF PLAYGROUND(SOLAR ST.LIGHTS,CONCRETEBENCHES)
- 23DJ0144₱98,008,132.33· 2023-07-04· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- Infra Projects 2023 (2nd Quarter)
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →