YUL EXPRESS CONST CO is listed as a company organization in Philippine public procurement records on this site, with 6 linked DPWH project(s) totaling about ₱110,312,885.78. Recorded delivery grade D (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
YUL EXPRESS CONST CO
DRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 6
- Total value
- ₱110,312,885.78
- Published flags
- 0
- Region
- Zambales 1st DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for YUL EXPRESS CONST CO — not an accusation or finding of wrongdoing.
Score: 63.40 / 100 · Projects in sample: 6 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 0/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 0
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 0
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 4
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 6
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 6
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — weight redistributed
- projects
- 6
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — weight redistributed
- projects
- 6
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS, and COA records. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
6 geotagged project(s) — Open full map
- CONCRETING OF PUROK 4 AND PUROK 6 FMR, BRGY. BEDDENG, SAN NARCISO, ZAMBALES25CL0178 · ₱29,521,643.96 · mapped
- FLOOD CONTROL WORKS ALONG LOOB-BUNGA CREEK, BOTOLAN, ZAMBALES25CL0150 · ₱22,232,692.90 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, PUROK 8 AND 9, BARANGAY PANAN, BOTOLAN, ZAMBALES25CL0120 · ₱19,548,528.84 · mapped
- CONCRETING OF BRGY. LOMBOY FMR, BRGY. LOMBOY, STA. CRUZ, ZAMBALES25CL0175 · ₱14,744,398.05 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT NBRIS (NAYOM), SANTA CRUZ, ZAMBALES25CL0004 · ₱14,482,401.67 · mapped
- CONSTRUCTION OF WATER SYSTEM, BRGY. LUCAPON SOUTH, STA. CRUZ, ZAMBALES25CL0206 · ₱9,783,220.36 · mapped
