DQT BUILDERS CORP FORMERLY DQT BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 191 linked DPWH project(s) totaling about ₱5,796,216,245.94. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
DQT BUILDERS CORP FORMERLY DQT BUILDERS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 191
- Total value
- ₱5,796,216,245.94
- Published flags
- 0
- Region
- Quezon 1st DEO · Region IV-A
Online presence
Google Maps: DQT Builders Corporation★ 5 (1 reviews)Google Maps, 2026-10-22
Envergara Street, corner Merchan Street, WJP7+WJR, Lucena City, 4301 Quezon
Public Record Grade
A transparent, data-derived summary of reported public records for DQT BUILDERS CORP FORMERLY DQT BUILDERS — not an accusation or finding of wrongdoing.
Score: 87.30 / 100 · Projects in sample: 191 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 77.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 77.8
- lateCompletedProjects
- 27
- onTimeCompletedProjects
- 146
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 189
- pastTargetOngoingProjects
- 16
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 191
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 191
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 191
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 191
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 47 of 158 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF BY-PASS & DIVERSION ROADS-BOAC-MOGPOG BY-PASS ROAD, PACKAGE 2, STA. 4+080-STA. 7+048.50, STA. 9+485-STA. 10+590.55, STA. 10+914.80-STA. 12+112.80, MARINDUQUE22E00003 · ₱111,775,843.75 · mapped
- IMPROVEMENT/WIDENING OF NATIONAL ROADS, ALONG N1, DAANG MAHARLIKA (LZ), MSR DIVERSION ROAD, S01994LZ, QUEZON17D00028 · ₱107,790,445.46 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES 1. COMPLETION OF MULTI-PURPOSE BUILDING (ALABAT ISLAND DISTRICT HOSPITAL), ALABAT, QUEZON24DL0160 · ₱99,000,000.00 · mapped
- CONSTRUCTION OF MANIWAYA CIRCUMFERENTIAL ROAD, STA. CRUZ, MARINDUQUE22EA0178 · ₱97,018,828.16 · mapped
- CONSTRUCTION OF MULTI- PURPOSE BUILDING, BARANGAY LAKAWAN, TAYABAS CITY, QUEZON21DK0194 · ₱96,500,000.00 · mapped
- ROAD UPGRADING (CONCRETE PAVING) ALONG SAN FRANCISCO-SAN ANDRES-SAN NARCISO ROAD K0355+319-K0357+81915DM0163 · ₱96,499,967.43 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, DR. DAMIAN REYES MEMORIAL ROAD, (PHASE 2), BOAC, MARINDUQUE22EA0208 · ₱96,496,857.04 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS, DR. DAMIAN REYES MEMORIAL ROAD, (PHASE I), BOAC, MARINDUQUE22EA0207 · ₱96,496,335.84 · mapped
- REHABILITATION OF TAMAYO-MORALES-ALOBO ROAD, STA. CRUZ, MARINDUQUE24EA0071 · ₱96,489,805.07 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD- K0084+000-K0086+00021EA0029 · ₱95,123,739.04 · mapped
- NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0037+000- K0037+640, K0037+687-K0039+00021EA0052 · ₱91,525,673.04 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL ROAD-K0074+000-K0075+130, K0075+320 - K0076+00025EA0007 · ₱87,608,452.59 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAUBAN-TIGNOAN ROAD (MAUBAN, QUEZON SIDE) QUEZON21DK0042 · ₱83,955,000.00 · mapped
- Construction of Mainit Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 600, Boac, Marinduque23EA0031 · ₱77,167,301.33 · mapped
- Construction of Poctoy Flood Control, Boac, Marinduque24EA0031 · ₱67,545,243.00 · mapped
- NETWORK DEVELOPMENT ROAD WIDENING ALONG MSR DIVERSION ROAD, K0125+(-350)-K0126+00019DK0003 · ₱67,500,785.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (AMPHITHEATER -PHASE 2) OF PULANG LUPA, BARANGAY BOLO, TORRIJOS, MARINDUQUE24EA0076 · ₱67,211,617.05 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD-K0024+000 - K0026+00023EA0024 · ₱67,162,800.85 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS DIVERSION ROAD MAUBAN BY-PASS ROAD INCLUDING NATIONAL ROW BRIDGE AND SLOPE PROTECTION, MAUBAN, QUEZON18DK0047 · ₱66,585,000.00 · mapped
- NETWORK DEV'T-CONST OF MISSING GAPS CONNECTING NAT'L ROADS INCLUDING ROW TAYABAS BYPASS ROAD , TAYAB16DK0112 · ₱66,500,000.00
- CONSTRUCTION OF LAPU-LAPU BUYABOD COASTAL ROAD LEADING TO BALUARTE WATCHTOWER, STA. CRUZ, MARINDUQUE22EA0234 · ₱65,608,640.32 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS JCT DAANG MAHARLIKA TAYABAS BY-PASS ROAD AND QUEZON ECO-TOURISM ROAD EXTENSION, TAYABAS, QUEZON18DK0066 · ₱62,725,000.00 · mapped
- CONSTRUCTION OF TECHNOLOGY & LIVELIHOOD EDUCATION INNOVATION BUILDING, PHILIPPINES NORMAL UNIVERSITY SOUTH LUZON, MAÑAGO EXTENSION, BRGY. MAGSAYSAY, LOPEZ, QUEZON (PHASE III)18DL0361 · ₱58,659,725.40 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (AMPHITHEATER), BRGY. BOLO, TORRIJOS, MARINDUQUE (PHASE II)24EA0078 · ₱58,210,306.77 · mapped
- NETWORK DEV'T -IMPV'T/WIDENING OF NAT'L ROADS (N1) ALONG DAANG MAHARLIKA (LZ) K0122+098-K0123+00016DK0114 · ₱57,900,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAUBAN-TIGNOAN ROAD (BRGY. CAGSIAY III, MAUBAN SECTION), QUEZON24DK0043 · ₱57,899,998.21 · mapped
- CSSP - CONST./ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) JCT. MSR CALUMPANG - TAYABAS ROAD LEADING TO MINOR BASILICA OF ST. MICHAEL DE ARCHANGEL, AND KAMAY NI HESUS, TAYABAS, QUEZON23DK0020 · ₱57,893,091.07 · mapped
- PROPOSED CONSTRUCTION OF FOUR (4) STOREY WITH ROOF DECK DEPARTMENT OF JUSTICE BUILDING, LUCENA CITY, QUEZON22DJ0169 · ₱57,133,013.02 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM (LEVEL III), BUENAVISTA, MARINDUQUE24EA0050 · ₱54,034,835.52 · mapped
- LOCAL PROGRAM - NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER MULTIPURPOSE/ FACILITIES STRUCTURES, CONSTRUCTION OF DPWH BUILDING, MARINDUQUE DISTRICT ENGINEERING OFFICE, BOAC, MARINDUQUE25EA0035 · ₱53,354,946.20 · mapped
- CSSP - CONST./ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - JCT MSR CALUMPANG - TAYABAS ROAD LEADING TO MINOR BASILICA OF ST. MICHAEL DE ARCHANGEL, AND KAMAY NI HESUS, TAYABAS, QUEZON24DK0015 · ₱53,073,193.00 · mapped
- Construction of Agos RIS Water Management Flood Control Project of Agos River, Gen. Nakar, Quezon24DK0028 · ₱51,467,062.50 · mapped
- NETWORK DEVELOPMENT ROAD WIDENING SECONDARY ROADS (P00201321LZ) LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, K0131+190-K0133+000, K0131+190-K0132+000, K0132+000-K0133+00018DK0022 · ₱51,019,550.00 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS NEW ROAD MAUBAN-TIGNOAN ROAD (MAUBAN SIDE) MAUBAN, QUEZON18DK0044 · ₱49,000,000.00 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF BYPASS AND DIVERSION, LUCBAN BYPASS ROAD (PACKAGE A) QUEZON20DK0053 · ₱49,000,000.00 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINK/NEW ROADS, MAUBAN-TIGNOAN ROAD, REAL SECTION-QUEZON20DK0073 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF PROTECTION WALL AT BARANGAY SADSARAN, MAUBAN, QUEZON20DK0055 · ₱49,000,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - JCT. DAANG MAHARLIKA - TAYABAS BY-PASS ROAD AND QUEZON ECO-TOURISM ROAD EXTENSION, QUEZON22DK0140 · ₱48,999,965.50 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - MAUBAN - TIGNOAN ROAD (MAUBAN SIDE), QUEZON23DK0021 · ₱48,999,553.64 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAGBILAO - TAYABAS - LUCBAN DIVERSION ROAD (TAYABAS SIDE), QUEZON23DK0012 · ₱48,997,483.64 · mapped
- CONSTRUCTION OF WATER SUPPLY SYSTEM (LEVEL III), TORRIJOS, MARINDUQUE24EA0051 · ₱48,995,543.91 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - MAUBAN-TIGNOAN ROAD, REAL SECTION, QUEZON22DK0173 · ₱48,979,416.50 · mapped
- NETWORK DEV'T-PAVING SHOULDER ALONG LUCBAN BYPASS ROAD (PHASE 1) LUCBAN & TAYABAS CITY-QUEZON PROV16DK0113 · ₱48,902,000.00
- ROAD UPGRADNG (UNPAVED TO PAVED) OF DR. DAMIAN REYES ROAD (BOAC SIDE), K0022+1092.00-K0024+013.0017EA0079 · ₱48,900,068.19 · mapped
- Construction of Flood Control Structure along Mogpog River, Barangay Mangyan Mababad, Mogpog, Marinduque23EA0052 · ₱48,018,034.70 · mapped
- A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS B. REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT - 417DL0098 · ₱47,875,240.80 · mapped
- CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SAMPALOC BY-PASS ROAD, QUEZON25DK0042 · ₱47,283,676.33 · mapped
- A. MFO -1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT A. IMPROVEMENT / WIDENING OF NATIONAL ROADS 1. PRIMARY ROADS B. OTHER PRIMARY ROADS 1. QUIRINO H-WAY - K0251+ - 511 - K0251+000, K0251+359 - K0251+600, K0251+834 - K0252+19217DL0031 · ₱47,179,922.71 · mapped
- CONSTRUCTION OF PLARIDEL NHS FOUR (4) STOREY TWELVE (12) CLASSROOM, NAGCARLAN, LAGUNA 3RD LD16DP0028 · ₱46,896,503.85
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROLSTRUCTURES ALONG AGOS RIVER, GENERAL NAKAR, QUEZON18DK0029 · ₱45,859,100.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 07950
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jul 20, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 07950); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
5 evaluations listed across 3 GPPB CPES releases; average final rating 94.6% over 2 rated projects; 5 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 2, 2025 | DPWH | ₱58,210,306.00 | Completed | 96.2% | 92.1% | 40th, p. 82 |
| Feb 18, 2025 | DPWH (JV) | ₱96,489,805.00 | Completed | 99.6% | 97.0% | 39th (rev), p. 53 |
| May 23, 2024 | DPWH | ₱51,467,063.00 | On-going | 95.0% | — | 38th, p. 62 |
| May 23, 2024 | DPWH | ₱53,073,240.00 | On-going | 93.6% | — | 38th, p. 62 |
| May 15, 2024 | DPWH (JV) | ₱88,629,520.00 | On-going | 95.0% | — | 38th, p. 63 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →