Construction of Drainage Structure23CI0052

Improvement/Rehabilitation/Construction of Drainage Magalang, Pampanga

Improvement/Rehabilitation/Construction of Drainage Magalang, Pampanga is a DPWH-tracked public work in MAGALANG (PAMPANGA), PAMPANGA, Region III. Reported contract value: ₱19,583,561.50. Status: Reported complete (DPWH). Contractor on record: CMDV CONST. Figures trace to sumbong.

MAGALANG (PAMPANGA), PAMPANGA, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱47,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-23-0019620 · ₱7,421,142 · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23CI0052 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-03-07 → 2023-09-19

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Pampanga

Based on the coordinates published with the DPWH record and NOAH file Pampanga.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Improvement/Rehabilitation/Construction of Drainage Magalang, Pampanga

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱47,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Maintenance of Flood Mitigation Structures along Quitangil River, Magalang, Pampanga - Phase 1
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-23-0019620

₱7,421,142.00 · FY2023

Released to Southern Philippines Agri-Business and Marine and Aquatic School of Technology (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

14 projects · ₱143.5M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM; SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ROADS BRGY PANDAN-TABUN, ANGELES CI

Pampanga 3rd DEO, Region III

2023₱29.4M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); CONSTRUCTION/IMPROVEMENT/REHABILITATION OF MULTIPURPOSE BUILDING IN MABALACAT CITY

Pampanga 3rd DEO, Region III

2023₱27.4M
Reported complete (DPWH)
No sat.

CONCRETING OF GATIAWIN - LACMIT FMR, BARANGAY GATIAWIN/ LACMIT, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2022₱11.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM; CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES; (ROADS LEVERGING LINKAGES FOR INDUSTRY AND TRADE INFRA PROGRAM-ROLL-IT) ANGELES CITY TOLL EXIT CONNECTING NLEX AND SCTEX SUPPORT

Pampanga 3rd DEO, Region III

2022₱9.8M
Reported complete (DPWH)
No sat.

Improvement/Rehabilitation/Construction of Drainage Mabalacat City, Pampanga

MABALACAT CITY (PAMPANGA), PAMPANGA, Region III

2023₱9.7M
Reported complete (DPWH)
No sat.

BASIC INFRA PROGRAM, ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONST OF ROAD, BRGY DAU, MABALACAT CITY, PAMPANGA STA. 0+000 TO STA 0+140, STA 0+000 TO STA 0+125, STA 0+000 TO STA 0+185

Pampanga 3rd DEO, Region III

2022₱4.9M
Reported complete (DPWH)
View all 14 projects →

4. Implementation

Contract Amount

₱19,583,561.50

Progress

Reported complete (DPWH)

Start Date

June 26, 2023

Target End

September 23, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaMagalangSan Ildefonso
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.