Buildings and Facilities15MB0185No coordinates published by DPWH

CONSTRUCTION OF BRGY. GYMNASIUM, BAWING/SIGUEL, GENERAL SANTOS CITY, SOUTH COTABATO 1ST LD

CONSTRUCTION OF BRGY. GYMNASIUM, BAWING/SIGUEL, GENERAL SANTOS CITY, SOUTH COTABATO 1ST LD is a DPWH-tracked public work in South Cotabato 1st DEO, Region XII. Reported contract value: ₱1,961,263.95. Status: Reported complete (DPWH). Contractor on record: FUENTABUILT CONST CORP. Figures trace to dpwh.

South Cotabato 1st DEO, Region XII

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region XII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2016 · ₱21,420

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-16-0004542 · ₱515,000 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 15MB0185 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2011-01-15 → 2025-08-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BRGY. GYMNASIUM, BAWING/SIGUEL, GENERAL SANTOS CITY, SOUTH COTABATO 1ST LD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱21,420,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure (Slope Protection) to Protect Lower Silway Bridge, Brgy. Labanggal, General Santos City, South Cotabato
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-16-0004542

₱515,000.00 · FY2016

Released to Samar National Pilot Opportunity School of AgricuP (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

211 projects · ₱1.8B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOM 4 STOREY 20 CL AT FATIMA NATIONAL SCHOOL, BRGY. FATIMA, GENERAL SANTOS CITY (2UNITS)

South Cotabato 1st DEO, Region XII

2016₱64.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES REHABILITATION OF MULTI-PURPOSE BUILDING, CANDIJAY, BOHOL

Bohol 3rd DEO, Region VII

2023₱61.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS- JCT. (TER)-JAGNA-SIERRA BULLONES RD - K0069 + 661 - K

Bohol 3rd DEO, Region VII

2022₱58.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD PROTECTION ALONG JCT. (TER) GUINDULMAN - ANDA - BADIANG - COGTONG ROAD, ANDA, BOHOL STA. 20+4

Bohol 3rd DEO, Region VII

2021₱53.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS-JCT (TER)-JAGNA-SIERRA BULLONES RD - K0082 + 678 - K0

Bohol 3rd DEO, Region VII

2022₱49.6M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LOAY INTERIOR ROAD-K0167+337 - K0168+839

Bohol 3rd DEO, Region VII

2024₱48.8M
Reported complete (DPWH)
View all 211 projects →

4. Implementation

Contract Amount

₱1,961,263.95

Progress

Reported complete (DPWH)

Start Date

March 13, 2016

Target End

May 11, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)City of General Santos
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.