Water Provision and Storage25IK0061

CONST. /REHAB. OF RAINWATER COLLECTION SYSTEM (RWCS), LAWAAN NATIONAL HIGH SCHOOL, PARANAS, SAMAR

CONST. /REHAB. OF RAINWATER COLLECTION SYSTEM (RWCS), LAWAAN NATIONAL HIGH SCHOOL, PARANAS, SAMAR is a DPWH-tracked public work in Samar 2nd DEO, Region VIII. Reported contract value: ₱490,317.67. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: BCG DESIGN AND CONST. Figures trace to dpwh.

Samar 2nd DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱33,900 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIII-25-0002576 · ₱6,970,505 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25IK0061 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-06-15 → 2025-04-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. /REHAB. OF RAINWATER COLLECTION SYSTEM (RWCS), LAWAAN NATIONAL HIGH SCHOOL, PARANAS, SAMAR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱33,900,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Barangay Dolongan, Basey, Samar
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-25-0002576

₱6,970,505.00 · FY2025

Released to Samar 2nd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

68 projects · ₱621.6M total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0731+940, K0731+525 - K0732+087, SAMAR 1ST LD

Region VIII, Region VIII

2025₱28.9M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0715+000 - K0715+282, K0723+000 - K0723+586, K0724+579 - K0724+650

Region VIII, Region VIII

2024₱28.9M
Past target date (DPWH On-Going)
No sat.

OO1:PREVENTIVE MAINTENANCE - TERTIARY ROADS - CALBAYOG DIVERSION RD. K0736+306 - K0736+665.65, SAMAR

Samar 1st DEO, Region VIII

2024₱25.1M
Reported complete (DPWH)
No sat.

CSSP- SIPAG- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BRGY. POLANGI TO BRGY. LITERON, CALBIGA, SAMAR

Samar 2nd DEO, Region VIII

2025₱24.5M
Past target date (DPWH On-Going)
No sat.

CSSP- SIPAG- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHAB. OF ROAD, BARANGAY LOKILOKON, PARANAS TO BARANGAY HINICA-AN, MOTIONG, SAMAR, STA. 0+700-STA. 1+228, PARANAS, SAMAR

Samar 2nd DEO, Region VIII

2025₱24.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPARK SAMAR MULTI-PURPOSE TRAINING CENTER), BRGY. PAYAO, CATBALOGAN CITY, SAMAR

Samar 2nd DEO, Region VIII

2023₱24.3M
Reported complete (100% progress, DPWH status On-Going)
View all 68 projects →

4. Implementation

Contract Amount

₱490,317.67

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

July 22, 2025

Target End

August 25, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)SamarParanasLawaan I
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.