Bridges25KK0045

REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - CABULAWAN BR. (B01311MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD

REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - CABULAWAN BR. (B01311MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD is a DPWH-tracked public work in Misamis Oriental 1st DEO, Region X. Reported contract value: ₱9,360,165.05. Status: Past target date (DPWH On-Going). Contractor on record: DICON BUILDERS CORP. Figures trace to dpwh.

Misamis Oriental 1st DEO, Region X
Region: Region X

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱100,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-25-0011891 · ₱631,595 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25KK0045 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    94% reported · imagery 2021-08-07 → 2025-07-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - CABULAWAN BR. (B01311MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱100,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure (Downstream of Cabulawan Bridge, Lagonglong, Misamis Oriental (Phase 2)
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-25-0011891

₱631,595.00 · FY2025

Released to Regional Office - XI (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱9,360,165.05

Progress

Past target date (DPWH On-Going)

Start Date

March 21, 2025

Target End

June 20, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - CABULAWAN BR. (B01311MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/02d326a7-8ec0-4a63-8387-662db620b51f

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Misamis OrientalLagonglongKabulawan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.