Buildings and Facilities17RE0175No coordinates published by DPWH

CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, ONE (1) CLASSROOM WORKSHOP BUILDING (7X18) AT RAMON TORRES TALOC NATIONAL HIGH SCHOOL, BAGO CITY, NEGROS OCCIDENTAL

CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, ONE (1) CLASSROOM WORKSHOP BUILDING (7X18) AT RAMON TORRES TALOC NATIONAL HIGH SCHOOL, BAGO CITY, NEGROS OCCIDENTAL is a DPWH-tracked public work in Negros Occidental 4th DEO, Negros Island Region. Reported contract value: ₱2,871,869.07. Status: Reported complete (DPWH). Contractor on record: SILVERGRACES CONST AND CONST SUPPLY. Figures trace to dpwh.

Negros Occidental 4th DEO, Negros Island Region

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Negros Island Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱28,521 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-CAR-17-0012607 · · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱2,871,869 · SILVERGRACES CONSTRUCTION & CONSTRUCTION SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-04-11 → 2025-11-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF  ONE (1) UNIT, ONE (1) STOREY, ONE (1) CLASSROOM WORKSHOP BUILDING (7X18) AT RAMON TORRES TALOC NATIONAL HIGH SCHOOL, BAGO CITY, NEGROS OCCIDENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱28,521,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Sibud Creek (Guimaras Strait - Outfall) (Rubble Concrete Gravity - Wall Type), Brgy. Sampinit, Bago City, Negros Occidental
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-CAR-17-0012607

₱-4,999.00 · FY2017

Released to Regional Office - CAR (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

17RE0175- Construction of One (1) Unit, One (1) S

₱2,871,869.07 · SILVERGRACES CONSTRUCTION & CONSTRUCTION SUPPLY

Award / contract ref: CONTRACT ID NO. 17RE0175

Contractor

B

408 projects · ₱4.0B total · 4 flags

4. Implementation

Contract Amount

₱2,871,869.07

Progress

Reported complete (DPWH)

Start Date

January 16, 2018

Target End

April 25, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OccidentalCity of Bago
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.