Buildings and Facilities24C00544

BASIC INFRASTRUCTURE PROGRAM - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BIAK-NA-BATO, SAN MIGUEL, BULACAN

BASIC INFRASTRUCTURE PROGRAM - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BIAK-NA-BATO, SAN MIGUEL, BULACAN is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱9,751,494.19. Status: Reported complete (DPWH). Contractor on record: DAUNGAN CONST DEV'T. Figures trace to dpwh.

Region III, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24C00544 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-05 → 2020-03-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC INFRASTRUCTURE PROGRAM - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BIAK-NA-BATO, SAN MIGUEL, BULACAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

80 projects · ₱707.8M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MALISIK - MABATO - SALAPUNGAN ROAD, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2024₱47.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SLOPE PROTECTION WORKS AT MAASIM RIVER, PHASE II (TRIBUTARY OF PAMPANGA RIVER) BARANGAY PULONG GUBAT, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2023₱32.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION / REHABILITATION OF MEXICO -MAGALANG ROAD / NINOY AQUINO BYWAY (ANAO, MEXICO - SAN ANTONIO, ARAYAT SECTION) MEXICO AND ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2019₱27.8M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. ANA CENTRAL HIGH SCHOOL, STA. LUCIA, STA. ANA, PAMPANGA

Pampanga 1st DEO, Region III

2023₱27.8M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION ALONG PAMPANGA RIVER, STA. 0+000 - STA. 0+023, CANDATING SECTION, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2021₱27.1M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROADS INCLUDING DRAINAGE CANAL, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2024₱26.8M
Reported complete (DPWH)
View all 80 projects →

4. Implementation

Contract Amount

₱9,751,494.19

Progress

Reported complete (DPWH)

Start Date

July 29, 2024

Target End

November 25, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanSan MiguelBiak-na-Bato
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.