Bridges16R00053

RECONSTRUCTION OF AGUISAN BRIDGE LEADING TO AGUISAN PORT AT BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL

RECONSTRUCTION OF AGUISAN BRIDGE LEADING TO AGUISAN PORT AT BARANGAY AGUISAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL is a DPWH-tracked public work in Region VI, Region VI. Reported contract value: ₱153,191,544.54. Status: Reported complete (DPWH). Contractor on record: SUPREME ABF CONST. Figures trace to dpwh.

Region VI, Region VI
Region: Region VI

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

449 projects · ₱16.9B total · 0 flags

Other projects by this contractor

No sat.

CLUSTER 20: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHAB. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, SAN VICENTE, PALAWAN, 20.1: STA. 167+325-STA. 167+445; 20.2: STA. 169+254-STA. 169+405; 20.3:

Region IV-B, Region IV-B

2022₱257.1M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION TO VILLAFLOR SECTION, LEFT SI

Region VII, Region VII

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL

Region VII, Region VII

2023₱236.3M
Past target date (DPWH On-Going)
No sat.

CLUSTER 17: SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TDC-PAGDANAN ROAD, 17.1: STA. 9+012-STA. 9+149; 17.2: STA. 7+893-STA. 7+946; 17.3: STA. 8+030-STA. 8+063; 17.4: STA. 7+94

Region IV-B, Region IV-B

2022₱216.3M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION, LOBOC, BOHOL

Region VII, Region VII

2023₱214.5M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 165+662-STA. 165+924, PALAWAN

Region IV-B, Region IV-B

2022₱193.0M
Reported complete (DPWH)
View all 449 projects →

4. Implementation

Contract Amount

₱153,191,544.54

Progress

Reported complete (DPWH)

Start Date

May 24, 2016

Target End

February 27, 2018

5. Audit