CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF LAMBAYONG RIS PROTECTION DIKE UPSTREAM OF DAM, ISULAN, SULTAN KUDARAT
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF LAMBAYONG RIS PROTECTION DIKE UPSTREAM OF DAM, ISULAN, SULTAN KUDARAT is a DPWH-tracked public work in Sultan Kudarat 1st DEO, Region XII. Reported contract value: ₱14,678,524.41. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: C A BETALAC CONST. Figures trace to dpwh.
Total Contract Cost
