Roads15PD0032

CONTRACT PACKAGE 8: ASSET PRESERVATION OF NATL RDS. A) PREV. MAINT BASED ON PAVT MGMT SYST/HWAY DEVT & MGMT-4 (HDM-4)(INT. SECT): A)MAGSAYSAY AVE (TRINIDAD RD) EAST SERVICE (S00523LZ) CHAINAGE 0-21 B) CHANUM ST. (S00447LZ) CHAINAGE 0-490 C) CHUNTUG#1 (S00

CONTRACT PACKAGE 8: ASSET PRESERVATION OF NATL RDS. A) PREV. MAINT BASED ON PAVT MGMT SYST/HWAY DEVT & MGMT-4 (HDM-4)(INT. SECT): A)MAGSAYSAY AVE (TRINIDAD RD) EAST SERVICE (S00523LZ) CHAINAGE 0-21 B) CHANUM ST. (S00447LZ) CHAINAGE 0-490 C) CHUNTUG#1 (S00 is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱12,864,565.71. Status: Reported complete (DPWH). Contractor on record: GOLDRICH CONST. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-16-0011713 · ₱60,921,463 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱12,864,566 · GOLDRICH CONSTRUCTION AND TRADING

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2011-11-30 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONTRACT PACKAGE 8: ASSET PRESERVATION OF NATL RDS. A) PREV. MAINT BASED ON PAVT MGMT SYST/HWAY DEVT & MGMT-4 (HDM-4)(INT. SECT): A)MAGSAYSAY AVE (TRINIDAD RD) EAST SERVICE (S00523LZ) CHAINAGE 0-21 B) CHANUM ST. (S00447LZ) CHAINAGE 0-490 C) CHUNTUG#1 (S00

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Flood Mitigation Structures / Drainage System along Crystal Cave to Asin Flood Control, Crystal Cave to Asin, Baguio City
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-16-0011713

₱60,921,463.00 · FY2016

Released to Western Visayas Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱12,864,565.71 · GOLDRICH CONSTRUCTION AND TRADING

Award / contract ref: 15PD0032

Contractor

B

122 projects · ₱6.1B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) CLAVERIA-CALANASAN-KABUGAO RD., K0678+899 - K0682+045

Cordillera Administrative Region, Cordillera Administrative Region

2018₱159.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION-PUGUIL-TUBADAY ROAD, CONNECTING BALAOAN-SANTOL ROAD IN SUPPORT TO SOFT BROOM INDUSTRY AND OTHER HIGH VALUE AGRICULTURAL PRODUCTS, SANTOL, LA UNION

Region I, Region I

2018₱144.7M
Reported complete (DPWH)
No sat.

CONTRACT PACKAGE 1: CONST/REH OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF FLOOD MITIGATION FACILITIES ALONG A. BALILI RIVER (MAIN) STA. 1+297-STA. 1+400 B. ASIN-GALLANO RIVER STA. 2+240-STA. 2+788

Baguio City DEO, Cordillera Administrative Region

2025₱139.8M
Past target date (DPWH On-Going)
No sat.

CONTRACT PACKAGE 1: A. PREVENTIVE MAINTENANCE -SECONDARY ROADS: 1. ASIN RD. K0305+(-535), K0305+000-K0306+541, (S04722LZ) CHAINAGE 000-CHAINAGE 1552. LOAKAN RD. K0249+875-K0250+096, K0250+380-K0250+842 3. MAGSAYSAY AVE (TRINIDAD RD) - (S00522LZ) CHAINAGE

Baguio City DEO, Cordillera Administrative Region

2023₱138.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL

Cordillera Administrative Region, Cordillera Administrative Region

2020₱133.0M
Reported complete (DPWH)
No sat.

CONTRACT PACKAGE 6: REH/RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: A. SECONDARY ROADS: 1. PMA RD. K0249+480-K0249+598 B. TERTIARY ROADS: 1. EASTERNLINK CIRCUM RD. K0247+930-K0247+980 2. PMA CUT-OFF RD. 3- (S05054LZ): CH. 1600 - CH. 1700

Baguio City DEO, Cordillera Administrative Region

2024₱124.7M
Reported complete (DPWH)
View all 122 projects →

4. Implementation

Contract Amount

₱12,864,565.71

Progress

Reported complete (DPWH)

Start Date

February 2, 2016

Target End

February 13, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioMagsaysay Private Road
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.