CONSTRUCTION OF CONCRETE ROAD BULALACAO-SAN JOSE-JCT MAPAYA ROAD, OCCIDENTAL MINDORO

CONSTRUCTION OF CONCRETE ROAD BULALACAO-SAN JOSE-JCT MAPAYA ROAD, OCCIDENTAL MINDORO is a DPWH-tracked public work in Mindoro Occidental DEO, Region IV-B. Reported contract value: ₱47,598,063.64. Status: Reported complete (DPWH). Contractor on record: ALGIMAR CONST CORP. Figures trace to dpwh.

Mindoro Occidental DEO, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱3,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-21-0011681 · · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21EB0031 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-04 → 2015-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CONCRETE ROAD BULALACAO-SAN JOSE-JCT MAPAYA ROAD, OCCIDENTAL MINDORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱3,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Brgy. San Luis, Mamburao, Occidental Mindoro
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0011681

₱0.00 · FY2021

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

68 projects · ₱2.9B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0265+346-K0266+470, K0267+053-K0267+112, STA. ELENA, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)

Region V, Region V

2024₱136.8M
Past target date (DPWH On-Going)
No sat.

MFO1 - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-SECONDARY ROADS; MASBATE-CATAINGAN-PLACER ROAD, K0025+420 TO K0036+850 WITH EXCEPTIONS, CATAINGAN AND PLACER, MASBATE PROVINCE

Region V, Region V

2017₱132.6M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (GRAVEL TO CONC.) JCT. TAGBAK-LUBANG-LOOC RD.-BINACAS RD., KO009+625 (STA. 009+625.00)-KO012+273 (STA. 012+265.00), KO012+664 (STA. 012+664.00)-KO012+876 (STA. 012+880.00), KO012+976 (STA. 013+051.00)-KO014+172.80 (STA. 014+265.00), KO014+2

Region IV-B, Region IV-B

2016₱118.1M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD, LABO SECTION, CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT

Region V, Region V

2023₱110.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF TALISAY COASTAL ROAD, MASBATE, SAN FERNANDO, MASBATE (1ST LEGISLATIVE DISTRICT)

Region V, Region V

2023₱99.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF SAN FERNANDO - SAN JACINTO - MONREAL ROAD, MASBATE.

Masbate 1st DEO, Region V

2023₱99.0M
Reported complete (DPWH)
View all 68 projects →

4. Implementation

Contract Amount

₱47,598,063.64

Progress

Reported complete (DPWH)

Start Date

March 23, 2021

Target End

January 6, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOccidental MindoroMagsaysayPurnaga
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.