ALGIMAR CONST CORP is listed as a company organization in Philippine public procurement records on this site, with 68 linked DPWH project(s) totaling about ₱2,862,808,310.78. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
ALGIMAR CONST CORP
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 68
- Total value
- ₱2,862,808,310.78
- Published flags
- 0
- Region
- Masbate 3rd DEO · Region V
Online presence
Google Maps: Algimar Construction★ 5 (6 reviews)Google Maps, 2026-10-22
4, Medina St, Masbate City, Masbate
Licensed officers (PCAB)
- Alejandro Navea Lim, Jr. · Authorized Managing Officer (PCAB license 15232) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ALGIMAR CONST CORP — not an accusation or finding of wrongdoing.
Score: 77.00 / 100 · Projects in sample: 68 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 58.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 58.6
- lateCompletedProjects
- 27
- onTimeCompletedProjects
- 31
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 67
- pastTargetOngoingProjects
- 9
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 68
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 68
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 68
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 68
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 44 of 57 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0265+346-K0266+470, K0267+053-K0267+112, STA. ELENA, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)24F00032 · ₱136,775,663.00 · mapped
- MFO1 - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-SECONDARY ROADS; MASBATE-CATAINGAN-PLACER ROAD, K0025+420 TO K0036+850 WITH EXCEPTIONS, CATAINGAN AND PLACER, MASBATE PROVINCE17F00009 · ₱132,598,604.25 · mapped
- ROAD UPGRADING (GRAVEL TO CONC.) JCT. TAGBAK-LUBANG-LOOC RD.-BINACAS RD., KO009+625 (STA. 009+625.00)-KO012+273 (STA. 012+265.00), KO012+664 (STA. 012+664.00)-KO012+876 (STA. 012+880.00), KO012+976 (STA. 013+051.00)-KO014+172.80 (STA. 014+265.00), KO014+216E00024 · ₱118,140,942.48 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD, LABO SECTION, CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT23F00013 · ₱109,967,154.45 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF TALISAY COASTAL ROAD, MASBATE, SAN FERNANDO, MASBATE (1ST LEGISLATIVE DISTRICT)23F00206 · ₱98,999,950.80 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF SAN FERNANDO - SAN JACINTO - MONREAL ROAD, MASBATE.23FM0033 · ₱98,999,926.57 · mapped
- NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, MASBATE-CATAINGAN-PLACER ROAD, K0023+072 - K0023+500, K0023+650 - K024+281, K0031+028 - K0032+000, K0033+527 - K0033+900, K0035+097 - K0036+00019FJ0018 · ₱96,444,782.48 · mapped
- NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, BUENAVISTA-KAWAYAN ROAD, K0035+000 - K0037+500, K0042+164 - K0042+96319FJ0006 · ₱96,219,581.28 · mapped
- CONST/REP/REHAB/IMPVT/CONC OF ARMY RD. BAGUBAG-SORVILLE-GOZAR-BINAKAS LEADING TO PAF GOZAR RADIO STA16E00022 · ₱92,142,492.26
- IMPVT/WIDENING OF CALAPAN NORTH ROAD K0015+509-K0015+547; K0015+561-K0016+204;K0020+05, CALAPAN CITY16E00027 · ₱91,958,819.27 · mapped
- CONST./IMPV'T./ROAD OPENING OF ACCESS ROAD LEADING TO MT. IGLIT-BACO NAT'L. PARK, STA. 0+000 - STA.16E00021 · ₱82,324,814.26
- NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, SECONDARY ROADS, MASBATE-CATAINGAN-PLACER RD, K0005+830.18FI0032 · ₱81,529,427.60 · mapped
- REHABILITATION/IMPROVEMENT OF DIMASALANG PORT19FJ0039 · ₱76,430,225.97 · mapped
- ROAD UPGRADING(UNPAVED TO PAVED) JCT.TAGBAK-LUBANG-LOOC RD-BINACAS ROAD, LUBANG16E00026 · ₱74,824,613.32 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD (S00016MT) - K0079+590 - K0080+663, AROROY, MASBATE25FI0032 · ₱70,876,750.14 · mapped
- CONST./IMPV'T. OF MALBOG JCT.-STA. FE GUINBIRAYAN PROVINCIAL ROAD LEADING TO SAN JOSE BEACHES, STA. 00+460.00 - STA. 00+997.00; STA. 02+774.00 - STA. 03+832.00 (W/ EXCEPTION); STA. 04+840.00 - STA. 05+920.70, ROMBLON16E00087 · ₱69,914,283.44
- LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, CONSTRUCTION OF ROAD, JUNCTION NATIONAL ROAD -BARANGAY SAN PEDRO-BARANGAY CONCEPTION, MADAMBA,AGUADA, MATAYUM ROAD, CATAINGAN, MASBATE21FJ0014 · ₱68,924,768.68 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4)MASBATE-MILAGROS ROAD,K0002+(-479.00)(K0001+521.00)-K0003+433.20,MASBATE CITY,MASBATE PROVINCE16F00050 · ₱59,354,497.00 · mapped
- RECONSTRUCTION OF CONCRETE PAVEMENT - ALONG MASBATE-CATAINGAN-PLACER RD (S00005MT) K0001+855 TO K0002+481, NET LENGTH = 1.180 LANE KM. (0.590 KM), MASBATE CITY19FI0031 · ₱57,763,862.27 · mapped
- BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, BUENAVISTA BR.(B00067MT) ALONG MASBATE-CATAINGAN-PLACER RD22FJ0031 · ₱53,310,843.43 · mapped
- BRIDGE PROGRAM- REPLACEMENT OF PERMANENT BRIDGES, MARCELLA BR. (B00033MT) ALONG MASBATE- CATAINGAN- PLACER RD.22FJ0010 · ₱52,082,596.27 · mapped
- NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERIARY ROAD, MASBATE CIRCUMFERENTIAL RD, K0003+100 - K018FI0028 · ₱51,552,518.21 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGE PAVED ROADS, MASBATE-CATAINGAN-PLACER ROAD, K0075+000 - K0075+668 & K0095+011 - K0095+77919FJ0010 · ₱51,393,354.58 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BALUD-PALANI-PANUBIGAN-PAJO-TALISAY ROAD LEADING TO PALANI BEACHES, PANUBIGAN PAJO A22FI0014 · ₱49,000,000.00 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - SAN FERNANDO NORTH ROAD - K0006+132 - K0006+538, K0009+000 - K0009+356, K0009+966 - KOO10+238, K0010+586 - K0010+686.23FM0037 · ₱48,249,967.12 · mapped
- CONSTRUCTION OF CONCRETE ROAD BULALACAO-SAN JOSE-JCT MAPAYA ROAD, OCCIDENTAL MINDORO21EB0031 · ₱47,598,063.64 · mapped
- SUPPORT FOR INFRASTRUCTURE PROJECT AND SOCIAL PROGRAMS - CONCRETING OF POBLACION - MAIHAO - PINAS ROAD, CAWAYAN, MASBATE18FJ0110 · ₱47,274,238.07 · mapped
- UPGRADING/ IMPROVEMENT OF JNR TO LOURDES P/R IN MAGSAYSAY, OCCIDENTAL MINDORO21EB0075 · ₱47,012,151.02 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONSTRUCTION OF CONCRETE ROAD-DARAGA, PLACER-DIVISORIA, CAWAYAN ROAD, CAWAYAN, MASBATE19FJ0015 · ₱46,818,006.19 · mapped
- NET. DEVT. PROG., ROAD WIDENING, MAS.-CAT-PLA ROAD - K0019+100-K0019+564, K0021+257-K0021+853,K0022+18FJ0059 · ₱46,547,791.97 · mapped
- Rehabilitation of Flood Mitigation Structure along San Juan River, Quezon City (Phase XVII)23OG0040 · ₱41,712,122.56 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BARANGAY TUGOS-BARA25F00325 · ₱37,441,466.78 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BARANGAY MALATAP, L25F00326 · ₱37,440,588.44 · mapped
- Construction of Flood Control Concrete Revetment at Buenavista River, Brgy. Magsaysay Uson, Masbate22FJ0012 · ₱35,277,048.57 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-SAN FERNANDO-SAN JACINTO-MONREAL ROAD, PACKAGE 2, MASBATE, SAN JACINTO, MASBATE (1ST LEGISLATIVE DISTRICT)23F00154 · ₱33,579,728.03 · mapped
- REHABILITATION/CONCRETING OF TANGAL-BANSALAGUIN-TUMIBO ROAD, LUBANG MINDORO OCCIDENTAL15EB0203 · ₱33,264,134.49
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0306+288-K0306+618, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)25F00081 · ₱31,620,460.42 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE, COLLAPSE AND LANDSLIDE ALONG JCT MWCR (BAGONG SILANG)-CABACAO DIVERSION ROAD, K0425+690-K0425+720 R/S, K0425+770-K0425+795 R/S, K0426+008-K0426+084 R/S, K0426+268-K0426+305 R/S, K0427+120-15EB0198 · ₱29,790,001.10 · mapped
- LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF BALANTAY - BURACAN ROAD, DIMASALANG, MASBATE19FJ0036 · ₱28,267,404.34 · mapped
- NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT SECONDARY ROADS, LAGTA-CROSSING MALINTA RD.18FI0009 · ₱25,181,871.67 · mapped
- ROAD WIDENING - ALONG MASBATE-CATAINGAN-PLACER RD (S00005MT) K0000+000 TO K0000+480, NET LENGTH=0.960 LANE KM (0.480 KM), MASBATE CITY19FI0040 · ₱24,507,047.78 · mapped
- NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS, JCT. MILAGROS-BALENO-LAGT18FI0020 · ₱23,368,738.84 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF LUBI - BINOOG ROAD, K0060 + 460 - K0060 + 1185, TABLAS ISLAND, ROMBLON16EH0045 · ₱18,987,137.89 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINGE SYSTEMS, MALIGAYA FLOOD CONTROL, LUBANG, OCCIDENTAL MINDORO15EB0214 · ₱16,589,841.69
- REHABILITAITON/CONCRETING OF TANGAL-LONGOS-TAGBAC ROAD, LUBANG MINDORO OCCIDENTAL15EB0191 · ₱16,072,773.82
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROAD INLCUDING DRAINAGE ALONG JCT. TLLR-TANGGAL ROAD (S00011LB) ,A) K0 003+(-)526-K0 003+(-)012,B) K0 003+319-K0 003+346, LUBANG, OCC. MINDORO15EB0189 · ₱15,337,970.92 · mapped
- 0FF-CARRIAGEWAY IMPRVMNT. INCLDNG DRAINAGE ALONG JCT.TLLR-BUROL RD. K08+(-)271-K08+25515EB0183 · ₱13,813,148.88 · mapped
- OFF-CARRIAGEWAY IMPRVMNT.INCLDNG. DRAINAGE ALONG JCT. TLLR-BINACAS RD., K014+540-K015+41015EB0182 · ₱12,713,374.78 · mapped
- CLUSTER 01: ROAD UPGRADING (UNPAVED TO PAVED) ALONG: A) JCT. TLLR-TANGGAL ROAD(S00011LB), B) JCT. TLLR-TUMIBO-LUBANG-BINACAS ROAD A) K0 004+760-K0 005+214, B) K0 005+280-K0 005+34515EB0186 · ₱12,536,285.00 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE ALONG JCT. MWCR (SAN ISIDRO)-PENAL COLONY-JCT. YAPANG ROAD (S00100MR), K0 306+000-K0 306+432, SABLAYAN, OCC. MINDORO15EB0180 · ₱12,185,366.16 · mapped
Equipment & capacity
PCAB license
- License no.
- 15232
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Aug 28, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 15232); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
8 evaluations listed across 6 GPPB CPES releases; average final rating 92.4% over 3 rated projects; 8 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Dec 1, 2024 | DPWH | ₱98,999,927.00 | Completed | 99.1% | 92.9% | 39th (rev), p. 18 |
| May 17, 2024 | DPWH | ₱98,999,927.00 | On-going | 88.8% | — | 38th, p. 18 |
| Mar 6, 2024 | NIA | ₱7,051,703.00 | Completed | 89.8% | 89.8% | 37th, p. 8 |
| Jun 5, 2023 | NHA | ₱66,825,000.00 | On-going | 79.7% | — | 38th, p. 18 |
| Mar 8, 2023 | DPWH | ₱35,277,049.00 | Final | 95.9% | 94.3% | 36th, p. 16 |
| Jul 29, 2022 | DPWH | ₱35,277,049.00 | On-going | 93.3% | — | 34th, p. 7 |
| Mar 8, 2020 | DPWH | ₱96,444,782.00 | On-going | 95.8% | — | 37th, p. 8 |
| Nov 13, 2019 | DPWH | ₱96,219,591.00 | On-going | 87.8% | — | 40th, p. 24 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 6 awards · ₱371,771,239.58
- MMDA Infrastructure: 3 awards · ₱94,885,182.82
- Philippine Fisheries Development Authority Infrastructure: 1 award · ₱71,463,644.20
- Municipality of Tagbina, Surigao Del Sur Infrastructure: 1 award · ₱49,989,984.62
- National Food Authority Infrastructure: 1 award · ₱23,780,262.80
- Philippine Ports Authority Infrastructure: 16 awards · ₱13,892,166.54
- LBP Goods & services: 1 award · ₱13,763,738.34
- Philippine Ports Authority Goods & services: 1 award · ₱970,003.89
- DPWH Goods & services: 1 award · ₱165,000.00
- Construction Projects
- MAINTENANCE OF MAINTENANCE OF GENERATOR SHED; WOR
- MAINTENANCE OF BASEPORT POWERHOUSE, GENERATOR SETS
- MAINTENANCE/PROVISION OF HAZARDOUS WASTE AND MATER
- MAINTENANCE OF OPERATIONAL AREA GUARDHOUSES AND RE
- MAINTENANCE OF FENCE AND GATE WITH GUARDHOUSE AT E
- MAINTENANCE OF TRUCK PARKING AREA FENCE
- MAINTENANCE OF OLD R.C. WHARF DECK AND PAVING BLOC
- MAINTENANCE OF PUBLIC COMFORT ROOMS
- MAINTENANCE/CONVERSION OF OLD PASSENGER SHED TO
- MAINTENANCE OF CONTAINER VAN TO COA & FINANCE STOR
- MAINTENANCE OF P.O.B.
- 25F00081
- Construction Projects
- 25F00325
- 25F00326
- Services of a General Contractor
- 25FI0032₱70,876,750.14· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MASBATE 2ND DEO
- Construction of Jose Panganiban Fish Port (Design
- CONSTRUCTION WORKS
- MAINTENANCE OF DRAINAGE SYSTEM
- MAINTENANCE OF PASSENGER TERMINAL WATER SYSTEM
- construction
- Construction Projects
- 24F00349
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →