CONSTRUCTION OF MALITUBOG RIVER BANK PROTECTION (UPSTREAM OF MALITUBOG BRIDGE, LEFT BANK) STA. 0+000 - STA. 0+504.663, BARANGAY POBLACION, BANISILAN, COTABATO
CONSTRUCTION OF MALITUBOG RIVER BANK PROTECTION (UPSTREAM OF MALITUBOG BRIDGE, LEFT BANK) STA. 0+000 - STA. 0+504.663, BARANGAY POBLACION, BANISILAN, COTABATO is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱66,648,531.68. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: BETTER WORK CONST. Figures trace to dpwh.
Total Contract Cost
