CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL ALONG TUNGAWAN RIVER (PHASE III), TUNGAWAN, ZAMBOANGA SIBUGAY
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL ALONG TUNGAWAN RIVER (PHASE III), TUNGAWAN, ZAMBOANGA SIBUGAY is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱103,883,348.31. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: 2M CONST. Figures trace to dpwh.
Total Contract Cost
