Roads21PD0069

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD, IRON STREET PUROK 7, UPPER QUEZON HILL, BAGUIO CITY

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD, IRON STREET PUROK 7, UPPER QUEZON HILL, BAGUIO CITY is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱2,843,303.45. Status: Reported complete (DPWH). Contractor on record: HDG CONST AND ENT. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱392,621,000 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱2,584,821 · HDG CONSTRUCTION AND ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-03-09 → 2025-08-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD, IRON STREET PUROK 7, UPPER QUEZON HILL, BAGUIO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Facilities/ Drainage System along Balili River (Tributaries), Sta 0+873 - Sta 1+238 (BS), Baguio City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱392,621,000.00 · FY2021

Released to Batangas 1st District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱2,584,821.32 · HDG CONSTRUCTION AND ENTERPRISES

Award / contract ref: 21PD0069

Contractor

B

26 projects · ₱151.5M total · 0 flags

4. Implementation

Contract Amount

₱2,843,303.45

Progress

Reported complete (DPWH)

Start Date

August 26, 2021

Target End

January 15, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD, IRON STREET PUROK 7, UPPER QUEZON HILL, BAGUIO CITY.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/0f5e3e49-9a38-479d-a7c2-f4fd9d5d00b1

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioQuezon Hill, Upper
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.