Roads24PL0060

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF SAN FRANCISCO - FF CRUZ - CALLAGDAO - CS-BLOCK 3 -

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF SAN FRANCISCO - FF CRUZ - CALLAGDAO - CS-BLOCK 3 - is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱5,623,941.16. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: JG CONST AND SUPPLY. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-D-24-0009317 · ₱1,538,361 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱5,623,941 · JG CONST AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-08-10 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF SAN FRANCISCO - FF CRUZ - CALLAGDAO - CS-BLOCK 3 -

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Malagnat / Callagdao / Lay - asan / Mangali Elementary School in Barangay Malagnat, Barangay Bulanao Centro, Barangay Lay - asan and Barangay Mangali, Pinukpuk, Tabuk City, and Tanudan, Kalinga
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-D-24-0009317

₱1,538,361.00 · FY2024

Released to Regional Office - BARMM (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24PL0060

₱5,623,941.16 · JG CONST AND SUPPLY

Award / contract ref: 24PL0060

Contractor

D

11 projects · ₱109.4M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF ALOY TO TAWANG, BRGY. GUILAYON FMR, GUILAYON, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2024₱16.8M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS-KALINGA-CAGAYAN RD (CALANAN-ENRILE SECTION) - K0510 + 438 - K0510 + 538, K0510 + 644 - K0510 + 768, K0512 + 000 - K0512 + 294,

Lower Kalinga DEO, Cordillera Administrative Region

2021₱16.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): BASIC INFRASTRUCTURE PROGRAM (BIP) - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION OF KALINGA GABRIELA MIJA KIM MEDICAL CENTER, TABUK CITY

Lower Kalinga DEO, Cordillera Administrative Region

2024₱14.8M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION (COMPLETION) OF MION KIM MEDICAL CENTER, BARANGAY AGBANNAWAG, TABUK CITY, KALINGA PROV

Lower Kalinga DEO, Cordillera Administrative Region

2024₱14.8M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF 1STY5CL, TOPPAN INTEGRATED SCHOOL, TABUK, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2023₱11.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. SAN JUAN, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2023₱9.9M
Reported complete (DPWH)
View all 11 projects →

4. Implementation

Contract Amount

₱5,623,941.16

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

June 25, 2024

Target End

October 2, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaCity of TabukBulanao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.