JG CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 11 linked DPWH project(s) totaling about ₱109,369,493.91. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
JG CONST AND SUPPLY
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 11
- Total value
- ₱109,369,493.91
- Published flags
- 0
- Region
- Lower Kalinga DEO · Cordillera Administrative Region
Public Record Grade
A transparent, data-derived summary of reported public records for JG CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 64.30 / 100 · Projects in sample: 11 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 19.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 19.2
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 2
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 8
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 11
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 11
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
10 geotagged projects — Open full map · Download projects (CSV)
- CONCRETING OF ALOY TO TAWANG, BRGY. GUILAYON FMR, GUILAYON, TABUK CITY, KALINGA24PL0076 · ₱16,783,066.70 · mapped
- ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS-KALINGA-CAGAYAN RD (CALANAN-ENRILE SECTION) - K0510 + 438 - K0510 + 538, K0510 + 644 - K0510 + 768, K0512 + 000 - K0512 + 294,21PL0100 · ₱16,199,400.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): BASIC INFRASTRUCTURE PROGRAM (BIP) - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION OF KALINGA GABRIELA MIJA KIM MEDICAL CENTER, TABUK CITY24PL0115 · ₱14,839,504.98 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION (COMPLETION) OF MION KIM MEDICAL CENTER, BARANGAY AGBANNAWAG, TABUK CITY, KALINGA PROV24PL0118 · ₱14,839,293.50 · mapped
- CONSTRUCTION OF 1STY5CL, TOPPAN INTEGRATED SCHOOL, TABUK, KALINGA23PL0112 · ₱11,369,919.39 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. SAN JUAN, TABUK CITY, KALINGA23PL0078 · ₱9,852,701.78 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BALBALAN-PINUKPUK RD - K0506 + 300 - K0506 + 500, K0523 + 373 - K05225PL0087 · ₱7,152,311.32
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF SAN FRANCISCO - FF CRUZ - CALLAGDAO - CS-BLOCK 3 -24PL0060 · ₱5,623,941.16 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MABALBALANAY-AGBANNAWAG BOX CULVERT, TABUK CITY, KALINGA25PL0110 · ₱4,948,951.49 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF PUROK 4/TUGA/GREENHILLS ACCESS ROAD, BRGY. CALANAN/TUGA/BULANAO, TABUK CITY, KALINGA22PL0059 · ₱4,795,403.74 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MALALAO, TABUK CITY, KALINGA24PL0075 · ₱2,964,999.85 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- City of Tabuk Infrastructure: 85 awards · ₱171,336,548.83
- DPWH Infrastructure: 17 awards · ₱120,373,697.91
- DPWH Goods & services: 60 awards · ₱35,211,283.98
- Province of Kalinga Infrastructure: 5 awards · ₱6,396,523.58
- City of Tabuk Goods & services: 2 awards · ₱2,735,740.00
- Barangays and Sangguniang Kabataan Goods & services: 1 award · ₱998,389.00
- DepEd Goods & services: 1 award · ₱94,935.88
- Purchase, Installation/Application of Road Safety
- 25PL0115₱1,805,791.73· 2025-08-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- 25PL0110₱4,948,951.49· 2025-06-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- 25PL0109₱999,000.68· 2025-06-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- Improvement of Road
- PR2025-04-0051
- 25PL0087₱7,152,311.32· 2025-05-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- Improvement of Road
- Installation of Streetlights
- Opening/Improvement of Farm to Market Road
- Opening of Farm to Market Road
- INSTALLATION OF STREETLIGHTS (Direct Contracting Proprietary in Nature)
- Improvement of Road
- 24PL0118₱14,839,293.50· 2024-10-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- 24PL0115₱14,839,504.98· 2024-10-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- Continuation of Gymnasium
- 24PL0082₱1,094,976.94· 2024-07-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- 24PL0075₱2,964,999.85· 2024-07-09· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- 24PL0076₱16,783,066.70· 2024-07-09· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- CONSTRUCTION OF FLOOD CONTROL SAN JUAN
- 24PL0060₱5,623,941.16· 2024-06-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- Improvement of Multi-Purpose Hall
- Installation of Street Lights
- 24PL0062₱4,441,585.61· 2024-05-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LOWER KALINGA DEO
- Improvement of Multi-Purpose Building Purok 2, G
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →