Buildings and Facilities21FG0074

CONSTRUCTION OF MULTI-PURPOSE BUILDING,PILITAB/TABOG, CARAMOAN, CAMARINES SUR

CONSTRUCTION OF MULTI-PURPOSE BUILDING,PILITAB/TABOG, CARAMOAN, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 4th DEO, Region V. Reported contract value: ₱1,879,416.73. Status: Reported complete (DPWH). Contractor on record: IA FERRER CONST. Figures trace to dpwh.

Camarines Sur 4th DEO, Region V
Region: Region V

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱2,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱404,461,000 · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,879,417 · IA FERRER CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2011-09-29 → 2025-08-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING,PILITAB/TABOG, CARAMOAN, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Balaton/ Tawog, Lagonoy/ Caramoan, Camarines Sur
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱404,461,000.00 · FY2021

Released to Cavite 2nd District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21FG0074 - Construction of Multi-Purpose Building,

₱1,879,416.73 · IA FERRER CONSTRUCTION & SUPPLY

Award / contract ref: 21FG0074

Contractor

B

55 projects · ₱692.2M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) JCT. GUIJALO-SAN VICENTE ROAD LEADING TO SAN VICENTE PORT - STA.6+350.00 - STA.7+600.00, CARAMOAN, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2022₱49.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) JCT. GUIJALO-SAN VICENTE ROAD LEADING TO SAN VICENTE PORT. STA.7+600.00 - STA.8+700.00CARAMOAN, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2023₱49.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION ROAD, BRGY. MAYBATO, PARACALE TO BRGY. MALANCAO - BASUD, LABO, CAMARINES NORTE

Camarines Norte DEO, Region V

2025₱48.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) JCT. GUIJALO - SAN VICENTE ROAD LEADING TO SAN VICENTE PORTSTA.5+000.00 - STA.6+350.00 CARAMOAN, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2021₱47.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FLOOD MITIGATION STRUCTURECARAPDAPAN CREEK BARANGAY ABO, BARANGAY SAN MIGUEL, BARANGAY CASUNA, TIGAON, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2025₱38.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) PRESENTACION TO CARAMOAN ROAD LEADING TO ISLETS, BEACHES, ROCK FORMATION, CAVES, LAGOON, CARAMOAN NATURAL PARK

Camarines Sur 4th DEO, Region V

2023₱31.0M
Reported complete (DPWH)
View all 55 projects →

4. Implementation

Contract Amount

₱1,879,416.73

Progress

Reported complete (DPWH)

Start Date

April 12, 2021

Target End

June 10, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurCaramoanTabog
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.