GAA 2025 OO-225EF0107

CONST. OF LUBGOB RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN

CONST. OF LUBGOB RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN is a DPWH-tracked public work in Palawan 2nd DEO, Region IV-B. Reported contract value: ₱42,413,924.70. Status: Past target date (DPWH On-Going). Contractor on record: ORANI CONST AND SUPPLY CORP FORMERLY:ORANI BUILDERS. Figures trace to dpwh.

Palawan 2nd DEO, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱43,497

    Probable match · score 0.93

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-25-0001004 · ₱2,775,798 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25EF0107 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    76% reported · imagery 2019-08-01 → 2019-08-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF LUBGOB RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 93%

UACS
18001
Amount
₱43,497,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Lubgob River Flood Control Structure, Quezon, Palawan
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-25-0001004

₱2,775,798.00 · FY2025

Released to Davao City 2nd District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

337 projects · ₱12.4B total · 0 flags

4. Implementation

Contract Amount

₱42,413,924.70

Progress

Past target date (DPWH On-Going)

Start Date

April 11, 2025

Target End

September 22, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONST. OF LUBGOB RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/11f495ba-8242-401c-a5c4-380ae9742636

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionPalawanQuezonIsugod
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.