RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT BUSUGAN BRIDGE (B01164MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD

RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT BUSUGAN BRIDGE (B01164MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD is a DPWH-tracked public work in Zamboanga City 2nd DEO, Region IX. Reported contract value: ₱11,152,338.67. Status: Reported complete (DPWH). Contractor on record: BENDIMIL CONST. Figures trace to dpwh.

Zamboanga City 2nd DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROX-16-0035183 · ₱2,982,261 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱11,242,638 · BENDIMIL CONSTRUCTION AND DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-05-10 → 2025-02-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT BUSUGAN BRIDGE (B01164MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of flood control structure, Busugan River, Sinubung Section, (including Right of Way Acquisition), Zamboanga City 1st LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROX-16-0035183

₱2,982,261.00 · FY2016

Released to Regional Office - X (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CONST. OF PROJECT

₱11,242,638.36 · BENDIMIL CONSTRUCTION AND DEVELOPMENT

Award / contract ref: 16ja0004

Contractor

D

31 projects · ₱2.0B total · 0 flags

Other projects by this contractor

No sat.

SIPAG - FLOOD MITIGATION STRUCTURES - PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF WATER TREATMENT PLANT FACILITY WITH FLOODGATE & PUMPING STATION, CATCHMENT 1 (PHASE 3), ZAMBOANGA CITY

Region IX, Region IX

2024₱144.6M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2 ZAMBOANGA CITY

Region IX, Region IX

2022₱144.6M
Past target date (DPWH On-Going)
No sat.

WIDENING OF PERMANENT BRIDGES - TIGBAO BRIDGE (B00556MN) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, LICOMO, ZAMBOANGA CITY

Region IX, Region IX

2019₱116.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2, ZAMBOANGA CITY, CATCHMENT 1 (PHASE II)

Region IX, Region IX

2023₱115.6M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF PULIRAN BRIDGE ALONG ZAMBOANGA COASTAL ROAD, ZAMBOANGA DEL NORTE, STA. 2011+300.00 - STA. 2011+800.00; ABUTMENT -A : STA. 2011+532.08; ABUTMENT -B : STA. 2011+652.92 (APPROACHES NET LENGTH : 379.16 LN.M.) (BRIDGE LENGTH: 120.84 LN.M.)

Region IX, Region IX

2016₱112.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE), UPPER LA PAZ, ZAMBOANGA CITY, PACKAGE III

Region IX, Region IX

2021₱111.3M
Reported complete (100% progress, DPWH status On-Going)
View all 31 projects →

4. Implementation

Contract Amount

₱11,152,338.67

Progress

Reported complete (DPWH)

Start Date

February 8, 2016

Target End

July 2, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)City of ZamboangaSinubung
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.