BENDIMIL CONST is listed as a company organization in Philippine public procurement records on this site, with 31 linked DPWH project(s) totaling about ₱2,003,686,743.36. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
BENDIMIL CONST
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 31
- Total value
- ₱2,003,686,743.36
- Published flags
- 0
- Region
- Region IX · Region IX
Online presence
Google Maps: Bendimil Construction & Development Corporation★ 5 (1 reviews)Google Maps, 2026-10-22
W34F+Q3C Summer Hill Subdivision, 30 Melaño Calixto St, Zamboanga City, 7000 Zamboanga del Sur
Public Record Grade
A transparent, data-derived summary of reported public records for BENDIMIL CONST — not an accusation or finding of wrongdoing.
Score: 65.60 / 100 · Projects in sample: 31 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 36.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 36.3
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 13
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 28
- pastTargetOngoingProjects
- 12
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 90.3/100 · Weight: 24%
- totalProjects
- 31
- componentScore
- 90.3
- terminatedProjects
- 1
- terminationRatePct
- 3.2
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.4
- componentScore
- 100
- projectsWithAbcAndCost
- 30
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 31
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 31
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
29 geotagged projects — Open full map
- SIPAG - FLOOD MITIGATION STRUCTURES - PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF WATER TREATMENT PLANT FACILITY WITH FLOODGATE & PUMPING STATION, CATCHMENT 1 (PHASE 3), ZAMBOANGA CITY24J00145 · ₱144,648,540.47 · mapped
- CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2 ZAMBOANGA CITY22J00076 · ₱144,623,230.12 · mapped
- WIDENING OF PERMANENT BRIDGES - TIGBAO BRIDGE (B00556MN) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, LICOMO, ZAMBOANGA CITY19J00012 · ₱116,802,610.17 · mapped
- CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2, ZAMBOANGA CITY, CATCHMENT 1 (PHASE II)23J00055 · ₱115,598,704.99 · mapped
- CONSTRUCTION OF PULIRAN BRIDGE ALONG ZAMBOANGA COASTAL ROAD, ZAMBOANGA DEL NORTE, STA. 2011+300.00 - STA. 2011+800.00; ABUTMENT -A : STA. 2011+532.08; ABUTMENT -B : STA. 2011+652.92 (APPROACHES NET LENGTH : 379.16 LN.M.) (BRIDGE LENGTH: 120.84 LN.M.)16J00044 · ₱112,385,102.84 · mapped
- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE), UPPER LA PAZ, ZAMBOANGA CITY, PACKAGE III21J00046 · ₱111,255,406.59 · mapped
- WIDENING OF MANICAHAN BRIDGE (B00574MN) ALONG PAGADIAN - ZAMBOANGA CITY ROAD, P00117212MN, ZAMBOANGA CITY, BEG. OF PROJ.: 1915+740.00, ABUTMENT A: 1915+758.00, ABUTMENT B: 1915+848.84, END OF PROJ.: 1915+870.00, APPROACHES NET LENGTH: 39.16 LN.M., BRIDGE17J00077 · ₱107,551,634.49 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 5, ZAMBOANGA CITY23J00072 · ₱101,122,407.62 · mapped
- WIDENING OF PERMANENT BRIDGES - WIDENING OF SAN RAMON BRIDGE INCLUDING APPROACHES, ZAMBOANGA CITY22J00073 · ₱96,829,403.45 · mapped
- SIPAG - FLOOD MITIGATION STRUCTURES - PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF WATER TREATMENT PLANT FACILITY WITH FLOODGATE & PUMPING STATION, CATCHMENT 1 (PHASE 2), ZAMBOANGA CITY24J00144 · ₱96,396,875.23 · mapped
- WIDENING OF SAN RAMON BRIDGE 2 (B01162MN) ALONG ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD, P00117212MN, ZAMBOANGA CITY, BEG. OF PROJ. 1959+840.00, ABUTMENT A 1959+852.58, ABUTMENT B 1959+944.92, END OF PROJ. 1959+960.00, APPROACHES NET LENGTH: 27.66 LN.M.,17J00037 · ₱95,465,458.61 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 3, ZAMBOANGA CITY22J00088 · ₱94,649,265.13 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG COASTAL BYPASS ROAD (MALA - BOLONG SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY18J00016 · ₱91,727,378.52 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 8, ZAMBOANGA CITY24J00014 · ₱91,220,642.95 · mapped
- CONSTRUCTION OF TWO (2) UNITS OF FOUR (4) STOREY TWENTY (20) CLASSROOM SCHOOL BUILDING AT TETUAN CENTRAL SCHOOL, ZAMBOANGA CITY17JA0156 · ₱81,315,140.63
- CONSTRUCTION OF TWO (2) UNITS FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT SOUTHCOM ELEMENTARY SCHOOL, ZAMBOANGA CITY17JA0149 · ₱60,029,163.52
- ROAD WIDENING ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD, ZAMBOANGA CITY, 1961 +750.00 - 1963 + 125.57, L=1,375.57 M, 1963 + 158.21 - 191963 + 576.65, L=418.44 M, 1963 + 627.49 - 1963 + 958.13, L=330.64 M, 1963+ 981.79 - 1964 + 400.00, L=418.21 M (NET16J00059 · ₱58,968,705.49 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 9, ZAMBOANGA CITY25J00091 · ₱57,841,167.47 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD, PACKAGE 5, ZAMBOANGA CITY24J00048 · ₱57,792,505.18 · mapped
- NEW CONSTRUCTION OF PERMANENT BRIDGE, BUSUGAN BRIDGE 2 AND ROAD APPROACHES PARALLEL TO EXISTING PERMANENT BRIDGE BUSUGAN BRIDGE (B01164MN), ALONG ZC-LABUAN-LIMPAPA ROAD17JA0009 · ₱39,488,780.09 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MANICAHAN BRIDGE (B00574MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY RD (PHASE II), ZAMBOANGA CITY22J00089 · ₱28,893,066.53 · mapped
- WIDENING OF PERMANENT BRIDGE PATALON BRIDGE 1 (B01167MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD18JA0008 · ₱17,081,201.67 · mapped
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - SINUNUC BR. (NEW) (B01771MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA RD20JA0006 · ₱15,439,085.78 · mapped
- WIDENING OF PERMANENT BRIDGE MILUAO BR. (B01166MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD18JA0007 · ₱14,624,382.77 · mapped
- WIDENING OF PERMANENT BRIDGE - TARLING BRIDGE (B01165MN) ALONG ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD17JA0010 · ₱13,759,863.49 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT BUSUGAN BRIDGE (B01164MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD16JA0004 · ₱11,152,338.67 · mapped
- CONSTRUCTION OF BRIDGE AT LABUAN SPILLWAY ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD, ZAMBOANGA CITY16JA0007 · ₱10,717,186.92 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) AT ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD (K1977+1462 TO K1977+1909)16JA0003 · ₱7,006,714.11 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE AT MILUAO BRIDGE (BO1166MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD, ZAMBOANGA CITY16JA0005 · ₱4,877,242.57 · mapped
- CONSTRUCTION OF NEW PERMANENT BRIDGES, COMPLETION OF PANIRAN PSCG BRIDGE ALONG ZAMBOANGA WEST COAST ROAD, LIMPAPA - SIBUCO ROAD, ZAMBOANGA DEL NORTE; STA. 1995+520.00 - STA. 1996+060.00.16J00021 · ₱4,423,537.29 · mapped
- CONSTRUCTION OF REGIONAL CRIME LABORATORY OFFICE BUILDING, CAMP COL. ROMEO A. ABENDAN, MERCEDES, ZAMBOANGA CITY, ZAMBOANGA DEL SUR21J00053 · ₱0.00 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
