Roads21HN0115

MACTAN CIRCUMFERENTIAL RD-K0019+048 -K0020+000, K0031+000 -K0032+000 (MODIFIED TO:OO1:ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINT.-SECONDARY ROADS-MACTAN CIRCUMFERENTIAL RD - K0031+000-K0032+540), LAPU-LAPU CITY

MACTAN CIRCUMFERENTIAL RD-K0019+048 -K0020+000, K0031+000 -K0032+000 (MODIFIED TO:OO1:ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINT.-SECONDARY ROADS-MACTAN CIRCUMFERENTIAL RD - K0031+000-K0032+540), LAPU-LAPU CITY is a DPWH-tracked public work in Cebu 6th DEO, Region VII. Reported contract value: ₱42,218,067.08. Status: Reported complete (DPWH). Contractor on record: JJ &J CONST. Figures trace to dpwh.

Cebu 6th DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-21-0017142 · ₱44,779,935 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱42,218,067 · JJ&J CONSTRUCTION AND GENERAL SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-17 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: MACTAN CIRCUMFERENTIAL RD-K0019+048 -K0020+000, K0031+000 -K0032+000 (MODIFIED TO:OO1:ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINT.-SECONDARY ROADS-MACTAN CIRCUMFERENTIAL RD - K0031+000-K0032+540), LAPU-LAPU CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control/Drainage in barangays Marigondon Phase 2, Basak and Babag, Lapu-Lapu City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-21-0017142

₱44,779,935.00 · FY2021

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21HN0115

₱42,218,067.08 · JJ&J CONSTRUCTION AND GENERAL SUPPLY

Contractor

B

124 projects · ₱2.6B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BARILI - ALOGUINSAN COASTAL ROAD

Cebu 3rd DEO, Region VII

2024₱96.5M
Reported complete (DPWH)
No sat.

CONV. AND SPECIAL SUPPORT PROG., (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATI'L. ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDG./ FACILITIES, CONST. OF AN ACCESS ROAD FROM THE TRANSCENTRAL HIGHWAY LEADING TO NEW PROVINCIAL CAPITOL IN BRGY. PONDOL, BAL

Region VII, Region VII

2023₱79.2M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: GUISOCON BR. (B00049NR) ALONG DUMAGUETE SOUTH RD, BAYAWAN CITY, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2025₱77.1M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: MANALONGON BR. (B00029NR) ALONG DUMAGUETE SOUTH RD, STA. CATALINA, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2025₱77.1M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINT. - SEC. ROADS- MACTAN CIRCUMFERENTIAL RD - (S00021LP) CHAINAGE 000 - CHAINAGE 2000, LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2022₱75.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: LITID BR. (B00030NR) ALONG DUMAGUETE SOUTH RD, STA. CATALINA, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2025₱72.3M
Past target date (DPWH On-Going)
View all 124 projects →

4. Implementation

Contract Amount

₱42,218,067.08

Progress

Reported complete (DPWH)

Start Date

August 26, 2021

Target End

October 21, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of Lapu-LapuCanjulao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.