Roads20HC0166

001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM OFF-CARRIAGEWAY IMPROVEMENT- TERTIARY ROADS- SAGBAYAN-DANAO RD- K0086+201-K0087+019, K0090+000-K0090+181, K0090+310-K0091+143, SAGBAYAN AND DANAO, BOHOL

001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM OFF-CARRIAGEWAY IMPROVEMENT- TERTIARY ROADS- SAGBAYAN-DANAO RD- K0086+201-K0087+019, K0090+000-K0090+181, K0090+310-K0091+143, SAGBAYAN AND DANAO, BOHOL is a DPWH-tracked public work in Bohol 2nd DEO, Region VII. Reported contract value: ₱14,459,400.00. Status: Reported complete (DPWH). Contractor on record: YS CONST. Figures trace to dpwh.

Bohol 2nd DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-C-20-0009279 · ₱38,565,858 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20HC0166 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-10-26 → 2017-10-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM OFF-CARRIAGEWAY IMPROVEMENT- TERTIARY ROADS- SAGBAYAN-DANAO RD- K0086+201-K0087+019, K0090+000-K0090+181, K0090+310-K0091+143, SAGBAYAN AND DANAO, BOHOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Poblacion Weste and Poblacion Este Flood Control Project, Catigbian, Bohol
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-20-0009279

₱38,565,858.00 · FY2020

Released to Bohol 2nd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

81 projects · ₱2.5B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF ROAD, BAGUMBAYAN, PILAR-CALUASAN, DAGOHOY, BOHOL SECTION 1: STA.0+000-STA.5+523.21, SEC

Region VII, Region VII

2021₱135.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), POBLACION-CANDUMAYAO- ALEGRIA-C

Region VII, Region VII

2022₱123.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL-IT)- CATIGBIAN-CLARIN VIA BOGTONGBOD ROAD (CL

Bohol 2nd DEO, Region VII

2023₱99.7M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS - JCT. (LIR) BUENAVISTA-CARMEN-DANAO-JETAFE RD. - K0160+275.00 - K0160+774.80; K0160+774.80-K0160+789.80; K0160+789.80 - K0161+360.00

Bohol 3rd DEO, Region VII

2023₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS -TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT)- K0073+029 - K0075+200, INABANGA, BOHOL

Bohol 2nd DEO, Region VII

2024₱92.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - JCT (LIR) CARMEN-SAGBAYAN-BACANI RD - K0171 + 640.00 - K0173 + 641.00

Bohol 3rd DEO, Region VII

2024₱85.1M
Reported complete (DPWH)
View all 81 projects →

4. Implementation

Contract Amount

₱14,459,400.00

Progress

Reported complete (DPWH)

Start Date

December 10, 2020

Target End

May 5, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholInabangaSan Jose
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.