GAA 2025 SSP25PD0106

BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD, FROM TABLAZON TO BUGNAY AREA, KADACLAN VILLAGE, BARANGAY LOAKAN APUGAN AND BARANGAY LOAKAN LIWANAG, BAGUIO CITY

BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD, FROM TABLAZON TO BUGNAY AREA, KADACLAN VILLAGE, BARANGAY LOAKAN APUGAN AND BARANGAY LOAKAN LIWANAG, BAGUIO CITY is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱5,760,768.00. Status: Past target date (DPWH On-Going). Contractor on record: BOYDROCK CONST. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱5,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-25-0018627 · ₱55,000,000 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25PD0106 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    55% reported · imagery 2024-02-18 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD, FROM TABLAZON TO BUGNAY AREA, KADACLAN VILLAGE, BARANGAY LOAKAN APUGAN AND BARANGAY LOAKAN LIWANAG, BAGUIO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Phase 3, Barangay San Antonio Village, Baguio City
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-25-0018627

₱55,000,000.00 · FY2025

Released to Bureau of Plant Industry (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

31 projects · ₱232.8M total · 0 flags

Other projects by this contractor

No sat.

CONTRACT PACKAGE 6: CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TIKAS) A) CONST (COMPLETION) OF HEADQUARTERS SUPPORT GROUP BUILDING, PMA, BAGUIO CITY B) CONST (COMPLETION) OF KILL HOUSE, PMA, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2022₱20.3M
Reported complete (DPWH)
No sat.

NATIONAL BUILDING PROGRAM-REHABILITATION OF NATIONAL BUREAU OF INVESTIGATION (NBI) BUILDING, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2022₱19.6M
Reported complete (DPWH)
No sat.

NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT FUND (NDRRMF) (CALAMITY FUND) FLOOD CONTROL STRUCTURES: RESTORATION OF COLLAPSED REVETMENT WALL NEAR BALACBAC BRIDGE DAMAGED BY TY OMPONG

Baguio City DEO, Cordillera Administrative Region

2018₱18.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TWO (2) STOREY BUILDING, DEPARTMENT OF JUSTICE (DOJ) SECRETARY'S COTTAGE, CABINET HILL, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2021₱17.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-MARCOS HI-WAY TO KENNON ROAD DIVERSION ROAD, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2021₱14.6M
Reported complete (DPWH)
No sat.

REH. OF DISASTER-REL. INFRA & OTHER FAC.-IMPLEM. OF CALAMITY-RELATED PROJS IN BAGUIO CITY W/C WERE DAMAGED BY TY VINTA, URDUJA, MARING, AMANG, HABAGAT, USMAN & OMPONG IN 2017 AND 2018: REST. OF ROADSLIP & OTHER REL. STRUCT ALONG BENGAO RD, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2019₱13.0M
Reported complete (DPWH)
View all 31 projects →

4. Implementation

Contract Amount

₱5,760,768.00

Progress

Past target date (DPWH On-Going)

Start Date

May 23, 2025

Target End

December 5, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioLiwanag-Loakan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.