Roads25CM0001

ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, OLONGAPO-BUGALLON RD., K0139+131-K0139+665, K0139+713-K0140+000, SUBIC, ZAMBALES

ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, OLONGAPO-BUGALLON RD., K0139+131-K0139+665, K0139+713-K0140+000, SUBIC, ZAMBALES is a DPWH-tracked public work in Zambales 2nd DEO, Region III. Reported contract value: ₱15,074,359.97. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ZBL ARCHITECT DESIGN AND BUILDERS. Figures trace to dpwh.

Zambales 2nd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱22,976 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXIII-25-0013990 · ₱1,474,000 · release to the district office, not itemized per project

    Possible match · score 0.57

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25CM0001 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-10-27 → 2019-10-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱18,360,974 per km= 0.7x the Region III median (n=192)

Contract cost ₱15,074,360 ÷ 0.821 km read from the DPWH title (“K0139+131-K0139+665; K0139+713-K0140+000”; K-post / station range length). National percentile: 18. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, OLONGAPO-BUGALLON RD., K0139+131-K0139+665, K0139+713-K0140+000, SUBIC, ZAMBALES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱22,976,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Flood Control Works along Loob-Bunga Creek, Botolan, Zambales
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXIII-25-0013990

₱1,474,000.00 · FY2025

Released to Tandag National Science High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

20 projects · ₱124.6M total · 0 flags

Other projects by this contractor

View all 20 projects →

4. Implementation

Contract Amount

₱15,074,359.97

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

March 21, 2025

Target End

August 17, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesSubicMangan-Vaca
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.