Buildings and Facilities22CM0039

MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. ELENA, BARANGAY CALAPACUAN, SUBIC, ZAMBALES

MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. ELENA, BARANGAY CALAPACUAN, SUBIC, ZAMBALES is a DPWH-tracked public work in Zambales 2nd DEO, Region III. Reported contract value: ₱5,445,000.00. Status: Reported complete (DPWH). Contractor on record: ZBL ARCHITECT DESIGN AND BUILDERS. Figures trace to dpwh.

Zambales 2nd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22CM0039 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-10-27 → 2019-10-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. ELENA, BARANGAY CALAPACUAN, SUBIC, ZAMBALES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Bayto River (Upstream North Approach), Sta. Cruz, Zambales
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Zambales 2nd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

20 projects · ₱124.6M total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, OLONGAPO-BUGALLON RD., K0139+131-K0139+665, K0139+713-K0140+000, SUBIC, ZAMBALES

Zambales 2nd DEO, Region III

2025₱15.1M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, OLONGAPO-BUGALLON RD., K0142+562-K0142+894, SUBIC, ZAMBALES

Zambales 2nd DEO, Region III

2025₱14.4M
Past target date (DPWH On-Going)
No sat.

CSSP, BIP, ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, EVANGELISTA STREET EXTENSION, BARANGAY PAMATAWAN, SUBIC, ZAMBALES

Zambales 2nd DEO, Region III

2025₱9.9M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT JOSEPHINE F. KHONGHUN SPECIAL EDUCATION CENTER, SUBIC, ZAMBALES

Zambales 2nd DEO, Region III

2024₱9.9M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, OLONGAPO - BUGALLON ROAD (OBR), K0139+900 - K0140+000, SUBIC, ZAMBALES

Zambales 2nd DEO, Region III

2023₱6.9M
Reported complete (DPWH)
No sat.

MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT LOCAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, REGIONAL SCIENCE HIGH SCHOOL, SUBIC BAY FREEPORT ZONE, OLONGAPO CITY, ZAMBALES

Zambales 2nd DEO, Region III

2022₱6.4M
Reported complete (DPWH)
View all 20 projects →

4. Implementation

Contract Amount

₱5,445,000.00

Progress

Reported complete (DPWH)

Start Date

February 11, 2022

Target End

June 10, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesSubicCalapacuan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.