Buildings and Facilities18PD0095

CY-2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 1- CONST. OF 4 STY 2 REGULAR WORKSHOP, 2 SCIENCE LABORATORY, & 2 ICT LABORATORY, & 4 CL, STO. TOMAS NATIONAL HIGH SCHOOL

CY-2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 1- CONST. OF 4 STY 2 REGULAR WORKSHOP, 2 SCIENCE LABORATORY, & 2 ICT LABORATORY, & 4 CL, STO. TOMAS NATIONAL HIGH SCHOOL is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱36,991,981.59. Status: Reported complete (DPWH). Contractor on record: KYRO BUILDERS INC. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱49,900 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-18-0016605 · ₱154,000 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱36,991,982 · KYRO BUILDERS INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-12-23 → 2025-08-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CY-2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 1- CONST. OF 4 STY 2 REGULAR WORKSHOP, 2 SCIENCE LABORATORY, & 2 ICT LABORATORY, & 4 CL, STO. TOMAS NATIONAL HIGH SCHOOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱49,900,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Rehabilitation of Flood Control Mitigation Facilities/Drainage System along Asin - Gallano River, Baguio City
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-18-0016605

₱154,000.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱36,991,981.59 · KYRO BUILDERS INC

Award / contract ref: 18PD0095

Contractor

C

36 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF SAN REMIGIO-BUGO ROAD CONNECTING - ODIONG-SIBALOM-SAN REMIGIO-LEON ROAD, ANTIQUE

Antique DEO, Region VI

2025₱144.6M
Past target date (DPWH On-Going)
No sat.

MFO 1:NAT'L RD. NETWORK SERVICES:NETWORK DEV'T:IMPV'T/WIDENING OF NAT'L ROADS, ALONG N1 CAGAYAN VALLEY RD., K0511+(-104)-K0512+000=STA.511 +(-140)-STA.512+.50, K0513+570-K0514+813.50=STA. 513+571-STA. 514+813.50, ALCALA, CAGAY

Region II, Region II

2017₱141.9M
Reported complete (DPWH)
No sat.

MFO 2: FLOOD MANAGEMENT SERVICES: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL SYSTEM, DACAL-LA FUGU, CAMALANIUGAN,

Region II, Region II

2017₱140.9M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NAT'L. ROADS-REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCL. DRAINAGE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. & MGMT.-4 (HDM4) SECONDARY ROADS, NUEVA ECIJA-PANGASINAN ROAD, N.E. 1ST LEGISLATIVE DIST. PROV. OF N.E.

Region III, Region III

2017₱108.2M
Reported complete (DPWH)
No sat.

ROAD UPGRADING OF CORON-BUS RD K0058+221-K0058+540; K0064+987-K0066+605; K0066+617-K0068+566;K0068

Region IV-B, Region IV-B

2016₱108.1M
Reported complete (DPWH)
No sat.

CONST./IMPR'VT. OF ACCESS ROADS LEADING TO AIRPROTS, SEAPORTS & DECLARED TOURISM DEST.-TO DECLARED TOURISM DEST.-CONST./REHAB. OF ACCESS ROAD THROUGH BRGY. PIAS LEADING TO MINALUNGAO NAT'L. PARK INCL. BAYUBUK & SANGILO BRIDGES, GEN. TINIO, N.E. 4TH L.D.NE

Region III, Region III

2016₱94.2M
Reported complete (DPWH)
View all 36 projects →

4. Implementation

Contract Amount

₱36,991,981.59

Progress

Reported complete (DPWH)

Start Date

June 28, 2018

Target End

March 24, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioSanto Tomas School Area
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.