Construction of Flood Mitigation Structures within Mindanao River Basin (along Pulangui River), Left Side, Bukidnon
Construction of Flood Mitigation Structures within Mindanao River Basin (along Pulangui River), Left Side, Bukidnon is a DPWH-tracked public work in BUKIDNON, Region X. Reported contract value: ₱61,533,022.77. Status: Reported complete (DPWH). Contractor on record: M MONTESCLAROS ENT INC. Figures trace to sumbong.
Total Contract Cost

