LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF RIPRAP AND IMPROVEMENT OF ROAD, PUROK IV, IRISAN, BAGUIO CITY

LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF RIPRAP AND IMPROVEMENT OF ROAD, PUROK IV, IRISAN, BAGUIO CITY is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱1,980,000.00. Status: Reported complete (DPWH). Contractor on record: JFALMAZAN CONST AND SUPPLY. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-A-19-0026253 · ₱61,610 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,901,375 · JFALMAZAN CONSTRUCTION AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-04 → 2025-08-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF RIPRAP AND IMPROVEMENT OF ROAD, PUROK IV, IRISAN, BAGUIO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-A-19-0026253

₱61,610.00 · FY2019

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱1,901,374.81 · JFALMAZAN CONSTRUCTION AND SUPPLY

Award / contract ref: 19PD0103

Contractor

B

22 projects · ₱119.3M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES/ DRAINAGE SYSTEM ALONG CRYSTAL CAVE TO ASIN, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2019₱24.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG BUED RIVER (TRIBUTARIES), BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2020₱23.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG BUED RIVER (MAIN), BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2020₱22.5M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM-REHABILITATION OF THE MULTI-PURPOSE FACILITY (COVERED COURT) PHASE 1, PUROK 5 BADIHOY ST. BARANGAY GUISAD SURONG, BAGUIO CITY, BENGUET

Baguio City DEO, Cordillera Administrative Region

2021₱4.6M
Reported complete (DPWH)
No sat.

REH. OF DISASTER REL. INFRA. AND OTHER FACILITIES-IMPLEM. OF CALAMITY-RELATED PROJS. IN BAGUIO CITY WHICH WERE DAMAGED BY TY VINTA, URDUJA, MARING, AMANG, HABAGAT, USMAN & OMPONG IN 2017 & 2018: REST. OF COLLAPSE REVETMENT WALL ALONG CAMP 8 CREEK TOWARD

Baguio City DEO, Cordillera Administrative Region

2019₱4.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS -RAINWATER COLLECTORS IN PUBLIC FACILITIES (15 LOCATIONS)

Baguio City DEO, Cordillera Administrative Region

2020₱4.1M
Reported complete (DPWH)
View all 22 projects →

4. Implementation

Contract Amount

₱1,980,000.00

Progress

Reported complete (DPWH)

Start Date

August 4, 2019

Target End

October 31, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioIrisan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.