Buildings and Facilities24CL0083

CONSTRUCTION OF PUBLIC COVERED COURT INCLUDING GROUND IMPROVEMENTS, BRGY. FERIA, PHASE 2 SAN FELIPE, ZAMBALES

CONSTRUCTION OF PUBLIC COVERED COURT INCLUDING GROUND IMPROVEMENTS, BRGY. FERIA, PHASE 2 SAN FELIPE, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱19,538,476.55. Status: Reported complete (DPWH). Contractor on record: ROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING. Figures trace to dpwh.

Zambales 1st DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVB-24-0008180 · ₱217,502 · release to the district office, not itemized per project

    Possible match · score 0.56

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24CL0083 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2024-02-21 → 2024-11-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF PUBLIC COVERED COURT INCLUDING GROUND IMPROVEMENTS, BRGY. FERIA, PHASE 2 SAN FELIPE, ZAMBALES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Omaya River, San Narciso, Zambales ( Phase 1 )
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVB-24-0008180

₱217,502.00 · FY2024

Released to President Diosdado Macapagal Memorial National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

114 projects · ₱9.4B total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TDC-PAGDANAN ROAD, STA. 9+318-STA. 9+495; STA. 9+864-STA. 10+055, PALAWAN

Region IV-B, Region IV-B

2022₱208.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BENGUET NUEVA VIZCAYA RD, K0275+324 - K0275+505

Cordillera Administrative Region, Cordillera Administrative Region

2023₱193.0M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A) CALASIAO OLD RD- K0204+000-K0204+725, K0204+741-K0205+000, K0205+000-K0205+108, K0205+120-K0206+000, K0206+000-K0207+000, K0207+000-K0207

Region I, Region I

2023₱193.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1378+330 - K1378+450, K1378+600 - K1378+700, K1379+070 - K1379+390, K1379+805 - K1379+850, K1388+550 - K1388+600, K1399+580 - K1399+635, K1403+140 - K1403+190, DAVAO DE ORO

Region XI, Region XI

2025₱185.7M
Past target date (DPWH On-Going)
No sat.

REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TDC-PAGDANAN ROAD, STA. 9+617-STA. 9+813; STA. 8+266-STA. 8+400, PALAWAN

Region IV-B, Region IV-B

2022₱152.9M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱144.0M
Past target date (DPWH On-Going)
View all 114 projects →

4. Implementation

Contract Amount

₱19,538,476.55

Progress

Reported complete (DPWH)

Start Date

July 10, 2024

Target End

May 20, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesSan FelipeSindol
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.