Flood Control and Drainage19PL0022

CONSTRUCTION OF MALIN-AWA FLOOD CONTROL ALONG CHICO RIVER, BRGY. MALIN-AWA, TABUK CITY, KALINGA

CONSTRUCTION OF MALIN-AWA FLOOD CONTROL ALONG CHICO RIVER, BRGY. MALIN-AWA, TABUK CITY, KALINGA is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱8,881,160.23. Status: Reported complete (DPWH). Contractor on record: RT BAGTANG CONST AND DEV'T CORP FORMERLY: MELS CONST. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROIII-19-0011575 · ₱229,674 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19PL0022 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-06-08 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Kalinga

Based on the coordinates published with the DPWH record and NOAH file Kalinga.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MALIN-AWA FLOOD CONTROL ALONG CHICO RIVER, BRGY. MALIN-AWA, TABUK CITY, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-19-0011575

₱229,674.00 · FY2019

Released to al Wo Baler National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

15 projects · ₱214.9M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF WAGUD - ACIGA - TAWANG ROAD (ABRA - KALINGA - APAYAO ROAD), PINUKPUK, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱47.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -ASSET PRESERVATION - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - RIZAL NATL RD (LIWAN WEST-BABALAG-MACUTAY SECT) - K0522 + 321 - K05

Lower Kalinga DEO, Cordillera Administrative Region

2024₱37.1M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - RIZAL NATL RD (LIWAN WEST-BABALAG-MACUTAY SECT) - K0522 + (-123) - K0522 + (-017), K0523 + 255 - K0524 + 351

Lower Kalinga DEO, Cordillera Administrative Region

2023₱31.9M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS ALONG NAMBARAN - ISABELA ROAD, TABUK CITY, KALINGA, K0509+038-K0509+355, K0516+457-K0517+337

Lower Kalinga DEO, Cordillera Administrative Region

2020₱26.9M
Reported complete (DPWH)
No sat.

CONCRETING/IMPROVEMENT OF SITIO SAN PABLO-SITIO MADOPDOP, BRGY. LACNOG WEST FMR

Lower Kalinga DEO, Cordillera Administrative Region

2021₱11.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, BANGAAN-BAKIR ACCESS ROAD CONNECTING LIWAN WEST NATIONAL ROAD AND BANGAAN-BAKIR ACCESS ROAD IN SUPPORT TO VEGGIE NOODLE PROCESSING INDUSTRY, RIZAL, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱9.7M
Reported complete (DPWH)
View all 15 projects →

4. Implementation

Contract Amount

₱8,881,160.23

Progress

Reported complete (DPWH)

Start Date

July 18, 2019

Target End

January 17, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaCity of TabukMalin-awa
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.