Roads17FG0034

INDV. PROJ. CONCRETING OF SAN ISIDRO-SAN VICENTE ROAD, BUHI, CAMARINES SUR STA. 0+000-STA. 0+920, STA. 0+000-STA. 0+231

INDV. PROJ. CONCRETING OF SAN ISIDRO-SAN VICENTE ROAD, BUHI, CAMARINES SUR STA. 0+000-STA. 0+920, STA. 0+000-STA. 0+231 is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱14,101,068.56. Status: Reported complete (DPWH). Contractor on record: SISAM CONST. Figures trace to dpwh.

Camarines Sur 5th DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱2,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0009159 · ₱86,116 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17FG0034 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-01 → 2021-02-16

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱12,251,146 per km= 0.6x the Region V median (n=151)

Contract cost ₱14,101,069 ÷ 1.151 km read from the DPWH title (“STA. 0+000-STA. 0+920; STA. 0+000-STA. 0+231”; K-post / station range length). National percentile: 20. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: INDV. PROJ. CONCRETING OF SAN ISIDRO-SAN VICENTE ROAD, BUHI, CAMARINES SUR STA. 0+000-STA. 0+920, STA. 0+000-STA. 0+231

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project, San Jose, Camaligan, Camarines Sur
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0009159

₱86,116.00 · FY2017

Released to Division of Camarines Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

28 projects · ₱955.9M total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - TABACO CITY-MALINAO-BUHI-IRIGA CITY ROAD, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2024₱106.2M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - TABACO CITY-MALINAO-BUHI-IRIGA CITY ROAD, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2025₱82.0M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF DIKE ALONG CAGSAWA RIVER (PACKAGE 2), BUSAY, DARAGA, ALBAY

Albay 2nd DEO, Region V

2024₱77.2M
Reported complete (DPWH)
No sat.

FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG BICOL RIVER, UPSTREAM OF STO. DOMINGO BRIDGE, NABUA, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2022₱49.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF IRIGA INOROGAN ROAD TO TALISAY ST. AND INOROGAN ST. LEADING TO INOROGAN SHRINE PILGRIMAGE AND ECOTOURISM AREA, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2022₱48.9M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0468+177 - K0468+326, K0469+420 - K0470+894, K0472+700 - K0472+905

Camarines Sur 5th DEO, Region V

2023₱47.4M
Reported complete (DPWH)
View all 28 projects →

4. Implementation

Contract Amount

₱14,101,068.56

Progress

Reported complete (DPWH)

Start Date

April 5, 2017

Target End

June 17, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurBuhiSan Vicente
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.