Flood Control and Drainage22FN0050

FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG BICOL RIVER, UPSTREAM OF STO. DOMINGO BRIDGE, NABUA, CAMARINES SUR

FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG BICOL RIVER, UPSTREAM OF STO. DOMINGO BRIDGE, NABUA, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱48,999,958.79. Status: Reported complete (DPWH). Contractor on record: SISAM CONST. Figures trace to dpwh.

Camarines Sur 5th DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FN0050 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-05-06 → 2021-03-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Camarines Sur

Based on the coordinates published with the DPWH record and NOAH file CamarinesSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG BICOL RIVER, UPSTREAM OF STO. DOMINGO BRIDGE, NABUA, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Bicol River, Upstream Bacolod Bridge, Left Side, Sta. 0+147 - Sta. 0+600, Bato, Camarines Sur
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Camarines Sur 5th DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

28 projects · ₱955.9M total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - TABACO CITY-MALINAO-BUHI-IRIGA CITY ROAD, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2024₱106.2M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - TABACO CITY-MALINAO-BUHI-IRIGA CITY ROAD, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2025₱82.0M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF DIKE ALONG CAGSAWA RIVER (PACKAGE 2), BUSAY, DARAGA, ALBAY

Albay 2nd DEO, Region V

2024₱77.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF IRIGA INOROGAN ROAD TO TALISAY ST. AND INOROGAN ST. LEADING TO INOROGAN SHRINE PILGRIMAGE AND ECOTOURISM AREA, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2022₱48.9M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0468+177 - K0468+326, K0469+420 - K0470+894, K0472+700 - K0472+905

Camarines Sur 5th DEO, Region V

2023₱47.4M
Reported complete (DPWH)
No sat.

SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BASCARAN - TALAHIB RIVER (PHASE 2), DARAGA, ALBAY

Albay 2nd DEO, Region V

2023₱47.3M
Reported complete (100% progress, DPWH status On-Going)
View all 28 projects →

4. Implementation

Contract Amount

₱48,999,958.79

Progress

Reported complete (DPWH)

Start Date

February 22, 2022

Target End

September 9, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG BICOL RIVER, UPSTREAM OF STO. DOMINGO BRIDGE, NABUA, CAMARINES SUR.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/6794b688-0b3c-46c0-837f-586d740624e5

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurNabuaInapatan
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.