Roads22FI0006

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS - ASID - TIGBAO - BARA - MALBUG ROAD, MASBATE, STA.49+110 - STA.50+675, MILAGROS, MASBATE

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS - ASID - TIGBAO - BARA - MALBUG ROAD, MASBATE, STA.49+110 - STA.50+675, MILAGROS, MASBATE is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱96,500,000.00. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: YAKAL CONST. Figures trace to dpwh.

Masbate 2nd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱36,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXIII-22-0001046 · ₱495,738 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FI0006 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-06-01 → 2025-06-22

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱61,661,342 per km= 2.8x the Region V median (n=151)

Contract cost ₱96,500,000 ÷ 1.565 km read from the DPWH title (“STA.49+110 - STA.50+675”; K-post / station range length). National percentile: 92. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS - ASID - TIGBAO - BARA - MALBUG ROAD, MASBATE, STA.49+110 - STA.50+675, MILAGROS, MASBATE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱36,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Concrete Revetment at Buenavista River, Brgy. Magsaysay Uson, Masbate
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXIII-22-0001046

₱495,738.00 · FY2022

Released to Tag-abaca National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

59 projects · ₱4.1B total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD. (S00016MT) - K0025+(-115) - K0030+140, MILAGROS, MASBATE

Masbate 2nd DEO, Region V

2022₱285.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD. (S00016MT) - K0042+682 - K0045+725, MANDAON, MASBATE

Masbate 2nd DEO, Region V

2022₱172.7M
Past target date (DPWH On-Going)
No sat.

OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM (MFO-1)NATIONAL DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, ASID-TIGBAO-BARA-MALBUG ROAD, INCLUDING ROW, MASBATE PROVINCE

Region V, Region V

2018₱172.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. TAWAD - BALUD RD. (S00023MT) - K0028+(-360) - K0028+944, K0029+910 - K0031+930, MILAGROS, MASBATE

Masbate 2nd DEO, Region V

2022₱158.2M
Past target date (DPWH On-Going)
No sat.

WIDENING ALONG BILIRAN CIR. ROAD, K1010+490-K1011+488; K1024+034-K1025+202; K1057+200-K1058+912; K1057+200-K1058+912; K1064+000-K1064+716; K1066+162-K1066+162-K1067+000; K1108+609, BILIRAN, NAVAL, KAWAYAN, CULABA & CABUCGAYAN, BILIRAN LONE DISTRICT ...,

Biliran DEO, Region VIII

2017₱156.2M
Reported complete (DPWH)
No sat.

ROAD WIDENING OF NAVAL - CAIBIRAN CROSS COUNTRY ROAD- K1027+890-K1028+210, K1028+268-K1028+770, K1033+738-K1033+980, K1033+1020-K1034+700, K1036+000-K1036+530, K1036+570-K1037+190, K1037+192-K1037+708, K1044+483.5-K1045+536, BILIRAN DISTRICT

Region VIII, Region VIII

2018₱140.1M
Past target date (DPWH On-Going)
View all 59 projects →

4. Implementation

Contract Amount

₱96,500,000.00

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

February 23, 2022

Target End

October 25, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)MasbateMilagrosSawmill
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.