Roads22HL0004

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BAYAWAN COASTAL ROAD (VILLAREAL-CARANOCHE SECTION) LEADING TO BAYAWAN BEACH AND COA

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BAYAWAN COASTAL ROAD (VILLAREAL-CARANOCHE SECTION) LEADING TO BAYAWAN BEACH AND COA is a DPWH-tracked public work in Negros Oriental 3rd DEO, Negros Island Region. Reported contract value: ₱9,800,000.00. Status: Reported complete (DPWH). Contractor on record: VVER CONST DEVELOPMENT CORP. Figures trace to dpwh.

Negros Oriental 3rd DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱36,981 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-D-22-0016473 · ₱606,405 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22HL0004 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-01-07 → 2023-10-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BAYAWAN COASTAL ROAD (VILLAREAL-CARANOCHE SECTION) LEADING TO BAYAWAN BEACH AND COA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱36,981,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along La Libertad River, Sta. 0+000 - Sta. 2+250, La Libertad, Negros Oriental
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-D-22-0016473

₱606,405.00 · FY2022

Released to Regional Office - XII (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

23 projects · ₱175.0M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF ONE(1) UNIT FOUR (4) STOREY WORKSHOP BUILDING AT MASULOG HS (7.0MX 23.0M PLUS CORRIDOR 2.50M), CANLAON CITY, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2018₱21.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ONE UNIT FOUR STOREY WORKSHOP BUILDING AT MALAIBA HIGH SCHOOL (7.0M X 23M PLUS CORRIDOR 2.50M) CANLAON CITY, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2018₱21.6M
Reported complete (DPWH)
No sat.

REHABILITATION OF MULTI-PURPOSE BUILDING (GYM), BARANGAY POBLACION, STA. CATALINA, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2021₱19.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF 3 UNITS ONE STOREY THREE CLASSROOM SCHOOL BUILDING W/ TOILET ATTACHED AT EACH CLASSROOM (9.5MX27.0M) AT NABILOG ES, NABILOG, TAYASAN, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2019₱14.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES- BRGY. IMELDA TO BRGY. HINAKPAN ROAD CONNECTING GUIHULNGAN TO BALOC ISABELA ROAD IN SUPPORT OF THE COFFEE AND BANANA PROCES

Negros Oriental 1st DEO, Negros Island Region

2019₱11.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES BRGY. IMELDA TO BRGY. HINAKPAN ROAD CONNECTING GUIHULNGAN TO BALOC ISABELA ROAD IN SUPPORT OF THE COFFEE AND BANANA PROCESSOR

Negros Oriental 1st DEO, Negros Island Region

2020₱9.8M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱9,800,000.00

Progress

Reported complete (DPWH)

Start Date

February 18, 2022

Target End

April 28, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalSanta CatalinaCaranoche
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.