Flood Control and Drainage17A00029No coordinates published by DPWH

CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, COMPLETION OF GUISIT RIVER CONTROL, BRGYS. ESTANCIA, DUPITAC, ABUCAY, GAYAMAT, CALLUZA, ANAO, & BIMMANGA, MUNICIPALITY OF PIDDIG, ILOCOS NORTE

CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, COMPLETION OF GUISIT RIVER CONTROL, BRGYS. ESTANCIA, DUPITAC, ABUCAY, GAYAMAT, CALLUZA, ANAO, & BIMMANGA, MUNICIPALITY OF PIDDIG, ILOCOS NORTE is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱76,299,985.09. Status: Reported complete (DPWH). Contractor on record: KATHA BUILDERS & SUPPLIES INC. Figures trace to dpwh.

Region I, Region I

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region I

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17A00029 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, COMPLETION OF GUISIT RIVER CONTROL, BRGYS. ESTANCIA, DUPITAC, ABUCAY, GAYAMAT, CALLUZA, ANAO, & BIMMANGA, MUNICIPALITY OF PIDDIG, ILOCOS NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

74 projects · ₱6.3B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, LAOAG CITY, ILOCOS NORTE

Region I, Region I

2025₱198.6M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B)

Region I, Region I

2024₱198.0M
Past target date (DPWH On-Going)

LOCAL PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE / PROTECTION WORKS, CONSTRUCTION/REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. MSR OLD ZIGZAG RD, QUEZON

Quezon 4th DEO, Region IV-A

2021₱193.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (LAOAG CITY-BACARRA SECTION), ILOCOS NORTE (PACKAGE B)

Region I, Region I

2024₱193.0M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF PUERTO PRINCESA EAST COASTAL ROAD, PUERTO PRINCESA CITY, PALAWAN

Region IV-B, Region IV-B

2023₱193.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, TANGAOAN - PALLAS ROAD LEADING TO PARAISO ECOTOURISM PROJECT ECO AND REFORESTATION PROJECT, PIDDIG, ILOCOS NORTE

Region I, Region I

2016₱181.3M
Reported complete (DPWH)
View all 74 projects →

4. Implementation

Contract Amount

₱76,299,985.09

Progress

Reported complete (DPWH)

Start Date

March 21, 2017

Target End

January 13, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, COMPLETION OF GUISIT RIVER CONTROL, BRGYS. ESTANCIA, DUPITAC, ABUCAY, GAYAMAT, CALLUZA, ANAO, & BIMMANGA, MUNICIPALITY OF PIDDIG, ILOCOS NORTE.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/23f1b584-ff0a-4756-93d5-7926394010b8

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.