Bridges24EE0022

RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-NEW BUSUANGA BR. (B00046CR) ALONG CORON-BUSUANGA RD., BUSUANGA, PALAWAN

RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-NEW BUSUANGA BR. (B00046CR) ALONG CORON-BUSUANGA RD., BUSUANGA, PALAWAN is a DPWH-tracked public work in Palawan 1st DEO, Region IV-B. Reported contract value: ₱7,823,999.40. Status: Reported complete (DPWH). Contractor on record: MAC BUILDERS CIVIL ENGINEERING CONST. Figures trace to dpwh.

Palawan 1st DEO, Region IV-B
Region: Region IV-B

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱18,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-24-0008890 · ₱205,000 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24EE0022 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-01-06 → 2021-01-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-NEW BUSUANGA BR. (B00046CR) ALONG CORON-BUSUANGA RD., BUSUANGA, PALAWAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱18,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Strucurue along Langogan River Upstream ( LS ) , Palawan
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-24-0008890

₱205,000.00 · FY2024

Released to Binugao National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

108 projects · ₱653.6M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF SITIO CASTILLA, BRGY. STO. NINO FMR, BUSUANGA, PALAWAN

Palawan 1st DEO, Region IV-B

2024₱14.9M
Reported complete (DPWH)
No sat.

PACKAGE 3-CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDINGS IN:1. LAJALA ELEMENTARY SCHOOL, BARANGAY LAJALA, CORON2. BIONG ELEMENTARY SCHOOL, BARANGAY OSMENA, CULION3. BALDAT ELEMENTARY SCHOOL, BARANGAY BALDAT, CULION

Palawan 1st DEO, Region IV-B

2024₱14.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BANAYBANAY I AND BANAYBANAY II, SAN JOSE, BAT

Batangas 4th DEO, Region IV-A

2024₱14.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD, BARANGAY CATANDALA, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2025₱14.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CONCRETE ROAD, BARANGAY DAYAPAN, IBAAN, BATANGAS

Batangas 4th DEO, Region IV-A

2025₱14.4M
Past target date (DPWH On-Going)
No sat.

PACKAGE 1-CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDINGS IN:1. BALOGO ELEMENTARY SCHOOL, BARANGAY BALOGO2. ARACELI NORTH CENTRAL SCHOOL, BARANGAY POBLACION, ARACELI, PALAWAN

Palawan 1st DEO, Region IV-B

2024₱9.9M
Past target date (DPWH On-Going)
View all 108 projects →

4. Implementation

Contract Amount

₱7,823,999.40

Progress

Reported complete (DPWH)

Start Date

February 14, 2024

Target End

May 1, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionPalawanBusuangaNew Busuanga
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.