GAA 2025 SSP25HN0149

SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (LAPU-LAPU CITY COLLEGE), BRGY. GUN-OB (PHASE 5), LAPU-LAPU CITY, CEBU

SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (LAPU-LAPU CITY COLLEGE), BRGY. GUN-OB (PHASE 5), LAPU-LAPU CITY, CEBU is a DPWH-tracked public work in Cebu 6th DEO, Region VII. Reported contract value: ₱29,106,000.00. Status: Past target date (DPWH On-Going). Contractor on record: GBUILD SUPPLY AND DEVELOPMENT INC. Figures trace to dpwh.

Cebu 6th DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-25-0008820 · ₱2,391,464,864 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25HN0149 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    31% reported · imagery 2025-01-18 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (LAPU-LAPU CITY COLLEGE), BRGY. GUN-OB (PHASE 5), LAPU-LAPU CITY, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-25-0008820

₱2,391,464,863.61 · FY2025

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

27 projects · ₱204.4M total · 0 flags

Other projects by this contractor

No sat.

OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -SECONDARY ROADS-TERMINAL BLDG ACCESS RD- K0013+200 - K0013 + 415, LAPU-LAPU CITY

Cebu 6th DEO, Region VII

2022₱19.6M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING, PAVEMENT MARKINGS) ALONG BOGO-POLAMBATO WHARF RD - K0102 + (-518) - K 0103 + 756, CITY OF BOGO, CEBU

Cebu 4th DEO, Region VII

2025₱19.3M
Past target date (DPWH On-Going)
No sat.

CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY CANJULAO, LAPU-LAPU CITY, CEBU,

Cebu 6th DEO, Region VII

2024₱9.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY TAYUD, LILOAN, CEBU

Cebu 5th DEO, Region VII

2022₱9.9M
Reported complete (DPWH)
No sat.

CSSP: BIP - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION - CONSTRUCTION OF CAUSEWAY AT BARANGAY CAUBIAN, LAPU-LAPU CITY, CEBU

Cebu 6th DEO, Region VII

2022₱9.8M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, IMPROVEMENT OF INTERSECTION AT CEBU NORTH HAGNAYA WHARF RD - K0101+257, CITY OF BOGO, CEBU

Cebu 4th DEO, Region VII

2025₱9.8M
Past target date (DPWH On-Going)
View all 27 projects →

4. Implementation

Contract Amount

₱29,106,000.00

Progress

Past target date (DPWH On-Going)

Start Date

June 3, 2025

Target End

March 30, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of Lapu-LapuGun-ob
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.