Flood Control and Drainage17OD0056No coordinates published by DPWH

CONSTRUCTION OF FLOOD CONTROL WALL ALONG MEYCAUYAN RIVER, STA. 2+415 TO STA. 2+630, VALENZUELA CITY 1ST LD

CONSTRUCTION OF FLOOD CONTROL WALL ALONG MEYCAUYAN RIVER, STA. 2+415 TO STA. 2+630, VALENZUELA CITY 1ST LD is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱45,565,336.00. Status: Reported complete (DPWH). Contractor on record: JASA GD 2000 CONST CORP FORMERLY:JASA BUILDER'S. Figures trace to dpwh.

Metro Manila 3rd DEO, National Capital Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: National Capital Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱50,000

    Probable match · score 0.90

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0019987 · ₱15,125 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱45,565,336 · JASA BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱211,932 per linear m= 1.0x the National Capital Region median (n=45)

Contract cost ₱45,565,336 ÷ 215 linear m read from the DPWH title (“STA. 2+415 TO STA. 2+630”; station range length (Sta. a+b to c+d)). National percentile: 76. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL WALL ALONG MEYCAUYAN RIVER, STA. 2+415 TO STA. 2+630, VALENZUELA CITY 1ST LD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Wall along Meycauayan River, Sta. 1+315 to Sta. 1+530, Valenzuela
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0019987

₱15,125.00 · FY2017

Released to Barcelona National Comprehensive High School Allot di pe (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

17OD0056

₱45,565,336.00 · JASA BUILDERS

Award / contract ref: 17OD0056

Contractor

B

243 projects · ₱9.9B total · 0 flags

Other projects by this contractor

View all 243 projects →

4. Implementation

Contract Amount

₱45,565,336.00

Progress

Reported complete (DPWH)

Start Date

April 27, 2017

Target End

December 29, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.