Roads21EF0141

CONST./IMPROVEMENT OF PARATUNGON ROAD LEADING TO SIR BROOKE'S AND TANAKI BEACH RESORTS, PANGOBILIAN, BROOKE'S POINT, PALAWAN

CONST./IMPROVEMENT OF PARATUNGON ROAD LEADING TO SIR BROOKE'S AND TANAKI BEACH RESORTS, PANGOBILIAN, BROOKE'S POINT, PALAWAN is a DPWH-tracked public work in Palawan 2nd DEO, Region IV-B. Reported contract value: ₱2,586,763.37. Status: Reported complete (DPWH). Contractor on record: PALBIC CONST AND SUPPLY. Figures trace to dpwh.

Palawan 2nd DEO, Region IV-B
Region: Region IV-B

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROV-21-0009063 · ₱46,950,000 · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21EF0141 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-02-14 → 2025-11-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST./IMPROVEMENT OF PARATUNGON ROAD LEADING TO SIR BROOKE'S AND TANAKI BEACH RESORTS, PANGOBILIAN, BROOKE'S POINT, PALAWAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Batang-Batang River Flood Control Structure in Narra, Palawan
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-21-0009063

₱46,950,000.00 · FY2021

Released to Division of Masbate (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

93 projects · ₱1.0B total · 0 flags

4. Implementation

Contract Amount

₱2,586,763.37

Progress

Reported complete (DPWH)

Start Date

September 6, 2021

Target End

January 18, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONST./IMPROVEMENT OF PARATUNGON ROAD LEADING TO SIR BROOKE'S AND TANAKI BEACH RESORTS, PANGOBILIAN, BROOKE'S POINT, PALAWAN.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/27a20455-ac68-4f76-8270-8c5ecad7b727

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionPalawanBrooke's PointPangobilian
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.