Flood Control and Drainage20MD0076

CONSTRUCTION OF MALITUBOG RIVER FLOOD CONTROL PROJECT (GUILING SECTION-PHASE II), GUILING, ALAMADA, COTABATO

CONSTRUCTION OF MALITUBOG RIVER FLOOD CONTROL PROJECT (GUILING SECTION-PHASE II), GUILING, ALAMADA, COTABATO is a DPWH-tracked public work in Cotabato 1st DEO, Region XII. Reported contract value: ₱18,964,946.78. Status: Reported complete (DPWH). Contractor on record: SUNSTONE CONST & SUPPLY. Figures trace to dpwh.

Cotabato 1st DEO, Region XII
Region: Region XII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱20,045

    Probable match · score 0.94

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20MD0076 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-16 → 2025-07-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cotabato

Based on the coordinates published with the DPWH record and NOAH file Cotabato.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MALITUBOG RIVER FLOOD CONTROL PROJECT (GUILING SECTION-PHASE II), GUILING, ALAMADA, COTABATO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 94%

UACS
18001
Amount
₱20,045,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Malitubog River Flood Control Project (Guiling Section-Phase II), Guiling, Alamada, Cotabato
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Cotabato 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

9 projects · ₱287.4M total · 0 flags

4. Implementation

Contract Amount

₱18,964,946.78

Progress

Reported complete (DPWH)

Start Date

February 14, 2020

Target End

September 22, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)CotabatoAlamadaGuiling
Storms whose wind field reached it
Jelawat 2023
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.